SPEC
49
PZ50VTA
Corrugated tube (engine stop
switch lead, throttle switch lead,
right grip warmer lead, and
thumb warmer lead)
Right handlebar switch
Pass the throttle cable over the
handlebar.
Pass the brake hose in front of
the handlebar.
Left handlebar switch
Pass the left handlebar switch
leads behind the handlebar.
Corrugated tube (left grip
warmer lead, grip/thumb
warmer adjustment switch lead,
brake light switch lead, and
headlight beam switch lead)
Auxiliary DC jack
Rectifier/regulator
AC magneto lead coupler
Connect the AC magneto lead
side coupler (gray) to the
rectifier/regulator.
Throttle position sensor coupler
(black)
Clamp the AC magneto lead,
throttle position sensor lead,
wire harness (oil pressure sen-
sor lead and oil pressure switch
lead), and pressure regulator
hose with the clamp.
Pass the AC magneto lead
behind the idle adjusting screw
wire.
Clamp the oil cooler inlet hose,
idle adjusting screw wire, and oil
pressure switch lead with the
clamp. Install the clamp with its
buckle positioned towards the
rear of the snowmobile and its
end facing to the right. Do not
clamp the oil pressure sensor
coupler.
Oil pressure sensor coupler
Pass the oil pressure switch
lead under the idle adjusting
screw, making sure that the lead
is not too taut.
Oil pressure switch coupler
(gray)
Starter motor
Knock sensor
Clamp
Pass the throttle body heater
outlet hose behind the engine
mounting bracket.
To the wire harness
Coolant temperature sensor
Thermostat housing cover
To the parking brake
To the brake
Brake hose
Main switch
Pass the corrugated tube, park-
ing brake cable, throttle cable,
meter lead, and brake hose with
the holder.
Clamp the corrugated tube,
parking brake cable, throttle
cable, meter lead, and brake
hose with the clamp.
Corrugated tube (engine stop
switch lead, throttle switch lead,
right grip warmer lead, and
thumb warmer lead)
Meter lead
Parking brake cable
Throttle cable
Corrugated tube (left grip
warmer lead, grip/thumb
warmer adjustment switch lead,
brake light switch lead, and
headlight beam switch lead)
Install the clamp with its buckle
positioned behind the leads,
cables, and hose and its end
facing to the right. Be sure to
position the corrugated tube
(engine stop switch lead, throt-
tle switch lead, right grip
warmer lead, and thumb
warmer lead) and corrugated
tube (left grip warmer lead, grip/
thumb warmer adjustment
switch lead, brake light switch
lead, and headlight beam switch
lead) towards the front and
clamp the throttle cable at the
throttle cable adjusting nut. For
other leads, order insignificant.
Position the corrugated tube
(engine stop switch lead, throt-
tle switch lead, right grip
warmer lead, and thumb
warmer lead) and corrugated
tube (left grip warmer lead, grip/
thumb warmer adjustment
switch lead, brake light switch
lead, and headlight beam switch
lead) towards the front of the
guide. For other leads, order
insignificant.
CABLE ROUTING
Summary of Contents for Phazer Venture Lite PZ50GTA 2011
Page 1: ......
Page 2: ......
Page 8: ......
Page 18: ...FI 9 WIRING DIAGRAM PZ50GTA PZ50RTA PZ50MTA FUEL INJECTION SYSTEM ...
Page 20: ...FI 11 WIRING DIAGRAM PZ50VTA FUEL INJECTION SYSTEM ...
Page 41: ......
Page 42: ...SPEC 32 CABLE ROUTING CABLE ROUTING ...
Page 44: ...SPEC 34 CABLE ROUTING ...
Page 46: ...SPEC 36 CABLE ROUTING ...
Page 48: ...SPEC 38 CABLE ROUTING ...
Page 50: ...SPEC 40 CABLE ROUTING ...
Page 52: ...SPEC 42 CABLE ROUTING ...
Page 54: ...SPEC 44 CABLE ROUTING ...
Page 56: ...SPEC 46 CABLE ROUTING ...
Page 58: ...SPEC 48 CABLE ROUTING ...
Page 60: ...SPEC 50 CABLE ROUTING ...
Page 62: ...SPEC 52 CABLE ROUTING ...
Page 64: ...SPEC 54 CABLE ROUTING ...
Page 66: ...SPEC 56 ENGINE OIL LUBRICATION CHART ENGINE OIL LUBRICATION CHART ...
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ...WIRING DIAGRAM 2011 PZ50GTA PZ50RTA PZ50MTA ...
Page 76: ...WIRING DIAGRAM 2011 PZ50GTA PZ50RTA PZ50MTA ...
Page 77: ...WIRING DIAGRAM 2011 PZ50VTA ...
Page 78: ...WIRING DIAGRAM 2011 PZ50VTA ...