PC9501N
33
2-3-3-4. TEST 40 (ATT)
The screen shown below appears on the monitor, and judgment is made automatically.
When the TEST 40 result is OK, the message shown below appears on the monitor.
The test program proceeds to TEST 50 automatically after TEST 40.
2-3-3-5. TEST 50 (MUTE)
The screen shown below appears on the monitor, and judgment is made automatically.
When the TEST 50 result is OK, the message shown below appears on the monitor.
The test program proceeds to TEST 60 automatically after TEST 50.
2-3-3-6. TEST 60 (MODE SW)
The screen shown below appears on the monitor.
Switch the MODE SW in the order of STEREO -> BRIDGE -> PARALLEL.
When the TEST 60 result is OK, the screen shown below appears on the monitor.
The test program proceeds to TEST 70 automatically after TEST 60.
2-3-3-7. TEST 70 (UNIT ID SW)
The screen shown below appears on the monitor.
Switch the AMP SW ID1, ID2, ID4, ID8 and ID16 to ON in order.
The screen shown below appears on the monitor.
When the TEST 70 result is OK, the message shown below appears on the monitor.
The test program proceeds to TEST 80 automatically after TEST 70.
>> 40: ATT TEST
ATT=-6dB
VSP(CH A) : 14.64 V --<OK>
VSP(CH B) : 14.75 V --<OK>
------------------<TEST40:OK>
>> 50: MUTE TEST
MUTE ON
VSP(CH A) : 0.00 V --<OK>
VSP(CH B) : 0.00 V --<OK>
------------------<TEST50:OK>
>> 60: MODE SW TEST
MODE:STEREO
MODE:BRIDGE
MODE:STEREO
MODE:BRIDGE
MODE:PARALLEL
------------------<TEST60:END>
>> 70: UNIT ID SW TEST
-00000
-00001
>> 70: UNIT ID SW TEST
-00000
-00001
-00011
-00111
-01111
-11111
------------------<TEST70:END>