8-38
E
HULL
HOOD
DECK AND HULL
DECK AND HULL
EXPLODED DIAGRAM
REMOVAL AND INSTALLATION CHART
Step
Procedure/Part name
Q’ty
Service points
DECK AND HULL DISASSEMBLY
Follow the left “Step” for disassembly.
1
Bolt
2
2
Bow eye
1
3
Nut
2
4
Rope hole fitting
2
5
Nut
1
6
Spout
1
7
Bolt
6
8
Sponson
2
NOTE:
Install the starboard and port side sponsons
at the same position.