5-40
E
POWR
GENERATOR AND STARTER MOTOR
EXPLODED DIAGRAM
Step
Procedure/Part name
Q’ty
Service points
8
Ground lead
2
9
Bolt
3
10
Lighting coil
1
Reverse the removal steps for installation.
4.9 N • m (0.49 kgf • m, 3.5 ft • Ib)
5
×
14 mm
14 N • m (1.4 kgf • m, 10 ft • Ib)
6
×
35 mm
14 N • m (1.4 kgf • m, 10 ft • Ib)
6
×
14 mm
1
2
2
6
6
5
5
10
9
3
4
7
8
2
5
6
4.9 N • m (0.49 kgf • m, 3.5 ft • Ib)
5
×
14 mm
5
×
14 mm
5
×
14 mm
LT
242
LT
242
LT
242
LT
242
5
×
14 mm
LT
242