POWR
Power unit
5-43
6D81G11
Checking the connecting rod big end
side clearance
1.
Measure the connecting rod big end side
clearance
a
. Replace the connecting
rod or crankshaft or both if out of specifi-
cation.
Checking the crankshaft
1.
Measure the crankshaft journal diameter
a
, crankpin diameter
b
, and crankpin
width
c
. Replace the crankshaft if out of
specification.
2.
Measure the crankshaft runout. Replace
the crankshaft if above specification.
Checking the crankpin oil clearance
1.
Clean the bearings and the connecting
rod.
2.
Install the upper bearing into the con-
necting rod
1
and the lower bearing into
the connecting rod cap
2
.
Connecting rod big end side
clearance
a
:
0.14–0.28 mm (0.0055–0.0110 in)
Crankshaft journal diameter
a
:
47.985–48.000 mm
(1.8892–1.8898 in)
Crankpin diameter
b
:
43.982–44.000 mm
(1.7316–1.7323 in)
Crankpin width
c
:
21.00–21.07 mm
(0.8268–0.8295 in)
Crankshaft runout limit:
0.03 mm (0.0012 in)
S6D85590
Summary of Contents for F90D
Page 1: ...F90D SERVICE MANUAL 6D8 28197 1G 11 LIT 18616 02 86 LIT186160286 ...
Page 68: ...6D81G11 5 2 1 2 3 4 5 6 7 8 9 Oil filter wrench YU 38411 Special service tools ...
Page 122: ...LOWR Lower unit 6 3 6D81G11 Dial indicator gauge YU 03097 Magnetic base stand YU A8438 ...
Page 144: ...LOWR Lower unit 6 25 6D81G11 Shimming 6 ...
Page 209: ...6D81G11 8 12 1 2 3 4 5 6 7 8 9 S60V8265 Br B Fuel control system Starting system ...
Page 241: ...YAMAHA MOTOR CORPORATION USA Printed in USA Jul 2004 0 0 1 CR E ...