POWR
Power unit
5-53
6D93G11
6.
Connect the fuel hose and shift position
switch coupler.
7.
Connect the PTT motor leads and PTT
switch coupler, and then install the junc-
tion box cover.
8.
Connect the battery leads.
9.
Connect the shift cable and throttle
cable, and then adjust their lengths.
For adjustment procedures, see Chapter
3, “Adjusting the throttle link and throttle
cable” and “Checking the gear shift oper-
ation.”
10. Install all parts removed during disas-
sembly.
11. Check the engine oil level.
NOTE:
If the engine oil is below the minimum level
mark
b
, add sufficient oil until the level is
between
a
and
b
.
T
R
.
.
PTT motor lead bolt:
4 N·m (0.4 kgf·m, 3.0 ft·lb)
T
R
.
.
Positive battery lead nut:
9 N·m (0.9 kgf·m, 6.6 ft·lb)
Recommended engine oil:
4-stroke motor oil
API: SE, SF, SG, SH, or SJ
SAE: 10W-30 or 10W-40
S60C1150
a
b
Summary of Contents for F80B
Page 1: ...F80B F100D SERVICE MANUAL 6D9 28197 3G 11 ...
Page 4: ......
Page 46: ...CHK ADJ Periodic checks and adjustments 3 17 6D93G11 MEMO ...
Page 148: ...LOWR Lower unit 6 25 6D93G11 Shimming 6 ...
Page 153: ...6D93G11 6 30 1 2 3 4 5 6 7 8 9 MEMO Backlash ...
Page 215: ...6D93G11 8 12 1 2 3 4 5 6 7 8 9 S60V8265 Br B Fuel control system Starting system ...
Page 245: ...6D93G11 i 5 1 2 3 4 5 6 7 8 9 Index MEMO ...
Page 247: ......
Page 248: ...YAMAHA MOTOR CO LTD Printed in the Netherlands Nov 2004 1 2 1 CR E ...