CVP-405/CVP-405PE/CVP-405PM
34
27-3.
Actuate Rubber
See procedure 9-9
27-4.
White Key (Black Key)
See procedure 9-10
27-5.
GH3 EBUS L Circuit Board
Tighten the five (5) screws marked [260A] and the
screw marked [262A] to fi x the GH3 EBUS L circuit
board. (Fig. 37)
27-6.
GH3 EBUS M Circuit Board
Tighten the four (4) screws marked [260B], the screw
marked [262A] and the screw marked [262B] to fi x
the GH3 EBUS M circuit board. (Fig. 37)
*
When installing the circuit boards, set it under hooks
to align the triangle marks of the circuit board and
projection parts of the frame as shown in fi gure 44.
27-7.
GH3 EBUS H Circuit Board
Tighten the five (5) screws marked [260C] and the
screw marked [262B] to fi x the GH3 EBUS H circuit
board. (Fig. 37)
(Fig. 44)(図 44)
27-3.
駆動ラバー
9-9 項参照
27-4.
白鍵(黒鍵)
9-10 項参照
27-5.
GH3 EBUS L シート
GH3 EBUS L シートを取り付け、[260A] のネジ 5 本
と [262A] のネジ 1 本を取り付けます。( 図 37)
27-6.
GH3 EBUS M シート
GH3 EBUS M シートを取り付け、[260B] のネジ 4 本、
[262A] のネジ 1 本、
[262B] のネジ 1 本を取り付けます。
( 図 37)
※
GH3 EBUS M シートを取り付ける際は、フレーム裏側にあ
るフック位置と基板の△マークが一致していることを確認して
ください。
(図 44)
27-7.
GH3 EBUS H シート
GH3 EBUS H シートを取り付け、[260C] のネジ 5 本
と [262B] のネジ 1 本を取り付けます。( 図 37)
27-2.
Spring
Place the keyboard assembly right side up. Fix key
springs on the frame by setting one at each slit and
pushing down once on each key spring. (Fig. 43)
*
Be careful of the direction of the spring. It should
be installed with its projecting end facing upward.
(Fig. 43-1)
27-2.
スプリング
GH3 鍵盤を表側にして、端が二本に分かれているス
プリングの先をハンマー白鍵(黒鍵)の切り込みに合
わせて、一度下に押し込んでフレームのフックに取り
付けます。
(図 43)
※
スプリングの向きに注意してください。スプリングは、図
43-1 のように上側が凸になるように取り付けます。
(Fig. 43)(図 43)
(Fig. 43-1)(図 43-1)
Spring
(スプリング)
Hook
(フック)
Frame
(フレーム)
Up
(上)
Hook
(フック)
Triangle mark
(△マーク)
GH3 EBUS M