6-27
STEERING
STEERING
REMOVING THE STEERING
Order
Part name
Q'ty
Remarks
A.
For CDN
TIGHTENING STEPS:
• Tighten ring nut. 38 Nm (3.8 m•kg, 27 ft•lb)
• Loosen it one turn.
• Retighten it. 7 Nm (0.7 m•kg, 5.1 ft•lb)
Hold the machine by placing the suitable stand
under the engine.
Refer to "HANDLING NOTE".
Headlight
Handlebar
Refer to "HANDLEBAR" section.
Front brake hose guide
Front fender
1
Multi-function display
1
2
Multi-function display bracket
1
3
Main switch
1
Disconnect the main switch lead.
4
Steering stem nut
1
5
Front fork
2
Refer to "FRONT FORK" section.
6
Upper bracket
1
7
Steering ring nut
1
Refer to removal section.
Summary of Contents for 2013 WR205F
Page 4: ......
Page 12: ...1 2 LOCATION OF IMPORTANT LABELS EUROPE ...
Page 13: ...1 3 LOCATION OF IMPORTANT LABELS AUS NZ ZA ...
Page 49: ...2 18 TIGHTENING TORQUES ...
Page 90: ...3 31 ELECTRICAL Charging method using a variable voltage charger ...
Page 91: ...3 32 ELECTRICAL Charging method using a constant voltage charger ...
Page 231: ......
Page 232: ...PRINTED IN JAPAN E PRINTED ON RECYCLED PAPER ...