CHAS
HANDLEBAR AND STEERING
6-20
REMOVAL
1. Place the scooter on its central stand and
place a suitable support under the engine.
2. Remove:
• Front wheel
See section “REMOVAL OF FRONT
WHEEL”
3. Remove:
• Mudguard
• Front fairing
See chapter 3,“FRONT BODYWORK,
MUDGUARDS” section.
4. Remove:
• Handlebar covers See chapter 3 “HAND-
LEBAR COVER” section
NOTE:
Before completely removing the rear cover
with the speedometer, disconnect the spee-
dometer cable and the signalling and lighting
system cables.
5. Remove:
• Front fork
See “REMOVAL OF FRONT FORK” sec-
tion
6. Remove:
• Brake pump support
• Brake pump.
• Throttle grip
7. Remove:
• Flange
(electrical installation)
1
2
1
Summary of Contents for 2002 YB50
Page 1: ...2002 SERVICE MANUAL YN505RN AE1 ...
Page 7: ...GEN INFO 1 ...
Page 15: ......
Page 16: ...SPEC 2 ...
Page 27: ...INSP ADJ 3 ...
Page 49: ......
Page 50: ...ENG 4 ...
Page 91: ...CARB 5 ...
Page 102: ...CHAS 6 ...
Page 128: ......
Page 129: ...ELEC 7 ...
Page 156: ...LOC AVER 8 ...