5-21
CYLINDER HEAD
ENG
NOTE:
18 Nm (1.8 m
S
kg)
18 Nm (1.8 m
S
kg)
150
_
NOTE:
NOTE:
CAUTION:
EAS00233
INSTALLING THE CYLINDER HEAD
1. Install:
S
gasket
New
1
S
dowel pins
2
2. Install:
S
cylinder head
Pass the timing chain through the timing chain
cavity.
3. Tighten:
S
cylinder head nuts
1
X
6
Initial
2nd
Final
S
Lubricate the cylinder head nuts and bolts with
engine oil.
S
First, tighten the nuts
1
X
6
to 18 Nm (1.8
m
S
kg) with a torgue wrench.
S
Loosen the nuts one by one following the tight-
ening order and then thighten them to 18 Nm
(1.8 m
S
kg) again.
S
Retighten the nuts to 150
_
with angle torgue
gauge.
S
Use an angle torgue gauge
1
and tighten
at the correct angle.
S
If an angle torgue gauge is not available, do
not tighten at an angle because accurate
tightening cannot be expected.
Thightening in this case should be con-
trolled by torgue and final tightening
should be to 40 Nm (4.0 m
S
kg).
4. Install:
S
exhaust camshaft
S
intake camshaft
Refer to “INSTALLING THE CAMSHAFTS”.
Summary of Contents for 2002 TDM900
Page 1: ......
Page 2: ......
Page 8: ......
Page 9: ......
Page 11: ...GEN INFO ...
Page 40: ......
Page 42: ...SPEC ...
Page 72: ...2 30 OIL FLOW DIAGRAMS SPEC 1 Main axle 2 Drive axle ...
Page 87: ......
Page 161: ......
Page 162: ......
Page 245: ......
Page 249: ...ENG ...
Page 345: ......
Page 346: ...COOL 6 ...
Page 348: ...COOL ...
Page 361: ......
Page 363: ...FI ...
Page 398: ...ELEC 8 ...
Page 434: ...8 34 SIGNALING SYSTEM ELEC EAS00780 SIGNALING SYSTEM CIRCUIT DIAGRAM ...
Page 460: ......
Page 461: ...9 TRBL SHTG ...
Page 472: ......
Page 473: ......
Page 475: ...TDM900P 2002 WIRING DIAGRAM OCE ...