Table 2. Maintenance Schedule (See Figure 10) (Continued)
Item
No.
Item
8 Hr/
1 day
5
350 Hr/
2 month
5
2000 Hr/
1 year
5
Procedure or
Quantity
Specification
1
ISO VG 46 or equivalent.
2
Exxon Univis HVI 26 or equivalent.
3
For freezer or cold storage operation, MIL-G-7711A.
4
With rated load.
5
Whichever comes first.
6
Hydraulic oil changed at initial 350 hour interval.
7
Equalization Charge approximately each month but not more than each week.
8
Multipurpose Grease with 2-4% Molybdenum Disulfate for normal operations.
X=Check C=Change L=Lubricate
NOTE: Never use steam to clean electrical parts.
Maintenance Schedule
52
Summary of Contents for MPB045VG
Page 13: ...Figure 4 Warning and Safety Labels Model Description 11...
Page 15: ...Instruments and Controls Figure 5 Instruments and Controls Model Description 13...
Page 50: ...Figure 9 Putting the Lift Truck on Blocks Maintenance Schedule Maintenance Schedule 48...
Page 51: ...Figure 10 Maintenance Points Maintenance Schedule 49...
Page 63: ...1 LED 2 LABEL Figure 14 Charger LED s Maintenance 61...
Page 70: ...Figure 18 Battery Compartment Maintenance 68...
Page 74: ...NOTES 72...