**Battery Escutcheon
Battery Escutcheon
Screw
10
9VDC
Power input
784
(9 Volt Power
Supply)
Hardwiring
Harnesses
Normally Open
Momentary Switch
NO
C
HARDWIRE OPTION DIAGRAM
Remote Entry Input
Thru Bolt
Controller Board Screw
*(See side note)
*Prior to installing the Controller
Board Screw the clearance
between the Battery Escutcheon
and the Rose Escutcheon should
be checked.
1. **Dry fit the Battery Escutcheon
to the Rose Escutcheon.
2. Check the clearance where
the two meet. If the clearance
is acceptable remove the
Battery Escutcheon and
proceed to step 4.
3. If the clearance is to great
loosen the Thru Bolt and pull
down on the Controller Board
(with light pressure) while
tightening the Thru Bolt.
Recheck clearance.
4. Install Controller Board Screw
at the bottom of the slot (to allow
additional adjustment if reqd).
5.** Install Battery Escutcheon and
Battery Escutcheon Screw.
** Battery Escutcheon has a machined
slot that engages the hook at the top of
the Controller Board prior to mating up
with rose Escutcheon.
**Hook