PROBLEM AND SOLUTIONS
PROBLEM
PROBABLE CAUSES
SOLUTION SUGGESTIONS
COAL IS NOT BURNING WELL
1)
Maybe you
are using the type of
coal other than the ones
recommended.
2)
Draft of the chimney
is bad.
3) It is possible that the stove is
getting air inside from the joining
parts or from the
place where
stove's
pipe enters the wall.
1)
Please
use quality type of coal
having 6000-7000 kcal/hour and by
having walnut-orange size. It must
be dry and the kind to leave less
ash. If you have to
use the type of
coal
having less calorie, then please
request
fan group from your dealer.
2)
Please control the draft of the
chimney. Get it cleaned if required.
Please refer to
'Chimneys Page'
(Page: 10) for further details about
the chimneys.
3) Insulate the joining parts of the
chimney with aluminium bandage.
Please take up the place where
chimney pipe enters the wall.
A "JINGLIN" TYPE WATER SOUND
COMING FROM
THE EXTERNAL
BOILER AND CORES AREN'T
GETTING HEATED ALTHOUGH
HEAT INDICATOR IS HIGH
External Boiler is full of air.
Pump can not pump the water.
Please refer to: 3-5
LAST CORE IS NOT GETTING
WARM
1) Horizontal pipe coming to the last
core has been used as small (R 1/2").
2) Spout has occurred towards the
inside at the
source of plastic pipe
and cross-section of the pipe has
been narrowed.
1) Increase the revolution of the
pump. If not solved, please consult
your installer.
CHIMNEY'S DRAFT
IS
WELL AND CENTRAL
HEATING
STOVE'S
COMBUSTION
DOES NOT SLOW DOWN.
Having chimney pipes very short
causing
acceleration in the draft.
Increase chimney's
pipes or place
"piker type pipe".
BOILER'S THERMOMETER
RAPIDLY RAISES TO 120°C
HOWEVER CORES DO NOT
GET
WARM
1) Central Heating Stove has
generated air.
2)
There has been electricity cut-off.
3) Circulation pump has generated
air.
4) Circulation pump has
malfunctioned.
1) Please refer to: 3-5.
2) If you encounter too much of
airing because of having very
frequent
electricity cut-offs, then
you
can use
"Power Supply Having
Full Sinus".
3) Please refer
to:
3-3.
4) Please contact the manufacturer
of the Pump.
Summary of Contents for 202
Page 6: ...YS 02 VE 202 KALOR FER TES SATI BA LANTI EMASI ekil 3...
Page 15: ......
Page 21: ...YS 02 and 2020 CENTRAL HEATING INSTALLATION CONNECTION DIAGRAM CD Figure 3...
Page 28: ......