background image

2.7

In

models

having

chain driven thermostatic regulator

(Figure

-

2/9), adjustment

of

the

heat is done

with the

numeric values taking

place

on

it.

2.8

Elimination of extreme heat: if

electricity

cut off occurs, by-pass

valve (Figure

-

2711

) must be

opened.

In

models having chain driven thermostatic regulator, bottom air-inlet duct

will

be closed

and combustion will be decreased.

2.9

It must be placed

in

the house because it also provides convection from its

surrounding.

It can

also be installed

in

a room or

in

the kitchen having chimney with good draft.

2.10

Central

bleating

Stove

can

not

be

placed in the

room

where

people sleep. It must not be installed

outside

of

the house.

2.11

Chimney must be cleaned before

attaching

the

pipes of the stove.

2.12

Attention must be

paid so that the pipes

of

the stove get linked to each other

in

good

order and

one

within the other.

2.13 Care must

be taken so

that

the

pipe do not enter

chimney

too

much.

2.14

A

bad chimney draft reduces the efficiency of your Central bleating Stove and at the same time,

it can also cause results

harmful for

the health.

2.15 Central heating installation

must

be done by the authorized installer by taking installation's

connection

diagram

into consideration.

2.16

Water must be provided to the installation over the return pipe

from

the radiator

(Figure

-

1/9).

System gets air if this is done

from

the

expansion boiler (Figure

-

1/12).

2.1

7

Grounded plug

must

be used and socket must be inserted to the plug.

3

-

OPERATING CENTRAL HEATING STOVE

3.1

When installation becomes

completed, socket must be

inserted

to

the

grounded plug,

The red

color

lamp from the two lamps indicates that there is

electricity

and the green one shows that

electricity has

come

to

the circulation

pump.

You

can

start

the

operation

of

the circulation

pump

by adjusting

the

pump of the thermostat

(Figure

-

1/9)

to

zero degree.

3.2

Valve must be

opened

in

order to give water to the

system

(Figure

-

1/9)

from

service water line.

Valve must be closed when

1/4 of

the

expansion tank

(Figure

-

1/12)

gets

filled.

3.3

By removing big

yellow screw on

the circulation pump,

be

sure

that

the

tip

of

motor

shaft

taking

place

inside turns.

If it is not

turning, shaft must be turned once

with the

screwdriver. Big yellow

screw

is applied to its place when shaft starts to turn.

3.4 Air

of

the cores must be removed. Water level

of

expansion tank (Figure

-

1/12) must be controlled.

3.5

It is recommended to operate the

circulation

pump

first

and then to give water to the system

in

order

not

to

have air within the

systems of

YS-02

and 202 model products. As for the problems

of

airing,

first

the water taking place

in

the system is emptied. Water is given again while circulation

pump is in the working state. Water must be given to the installation

from

the inlet pipe

of

the

boiler

(Figure

-

1/9).

3.6 After

becoming

sure

that there is no

leakage in

the

system,

fuel

is loaded to the firing chamber

and then the

fire

is set. Pump thermostat

(Figure

-

1/8)

is adjusted. Pump

will

start working

when

the temperature

of

the water exceeds

40°C.

3.7

Temperature of

the boiler's water which is determinant

for

the temperature of the

room,

is adjusted

from

chain driven thermostatic regulator (Figure

-

1/8)

and this regulator is optional. Chain driven

thermostatic regulator automatically controls burning speed

of Central

bleating

Stove

and it

maintains the heat

of

the water

fixed

at

the adjusted temperature.

3.8

In

order to obtain a

good heat,

the coal

having

6000-7000

kcal/hour, dry

and the kind to cause

less ash and by having walnut-orange size must be preferred. Big size coal

comforts

the inlet

of

the air. You

can

also mix walnut size coal

with

orange

size coal.

3.9 Central bleating Stove must

be ignited from the

top. If it

is ignited from the bottom,

volatile

substances

taking

place

in

the coal

will

be thrown out without

getting

burned. This means inefficient

burning

and environmental pollution.

Summary of Contents for 202

Page 1: ...info yakarsoba com Tel 90 212 432 43 80 knRMFERM Makina San ve Tic Ltd ti Esenler stanbul Kat Yak tl Kaloriferli Soba MODEL NO YS 02 202 201 YS 02 iki kazanl KULLANIM KILAVUZU Bu k lavuzu okumadan kal...

Page 2: ...nlerini se ti iniz i in te ekk r ederiz Size yard mc olmak i in haz rlam oldu umuz bu kullanma k lavuunu okuyup i erisindeki talimatlara uydu unuz takdirde kaloriferli soban zdan en y ksek verimi alac...

Page 3: ...SAT BA LANTI EMASI 4 ELEKTR K EMASI 4 5 YERLE M YER N N SE LMES VE KURULUM TAL MATLARI 5 6 KALOR FERL SOBANIN ALI TIRILMASI 6 7 UYARI TAVS YELER 8 BACALAR VE D KKAT ED LMES GEREKENLER 8 9 SORUN VE Z...

Page 4: ...i erisinde y klenen odun ve k m r n belirli tutu turma elemanlar ra ka t gibi ile yakan bu sebeple ortaya kan s enerjisi ile ortam ve di er odalar petekler yard m ile s tan baca sistemi vas tas yla d...

Page 5: ...olik Emave Kapak 3 st Maiolik Emave Kapak S No Par a Ad 15 st D k m Kapak 14 Kazana So uk Su k 13 Kazana s cak Su ak 12 Hava k s 11 R1 K resel Vana 10 Pompa 9 Hava k 8 Termostat Termometre U Yata 2 st...

Page 6: ...YS 02 VE 202 KALOR FER TES SATI BA LANTI EMASI ekil 3...

Page 7: ...22 125 1 2 201 18 14 15 100 1 2 2 1 Kaloriferli soban n alt na a rl n ta yacak ve s cakl a dayan kl tabla koyun 2 2 Kaloriferli soban n duvarda uzakl 40 cm olmal d r A k genle me kazan kullan m zorun...

Page 8: ...i erideki motor mili ucunun d nd nden emin olun D nm yor ise mili tornavida ile bir tur evirin Mil d nmeye ba lay nca b y k sar viday yerine s k n 3 4 Peteklerin havas n al n Genle me ekil 1 12 kazan...

Page 9: ...ermostatik reg lat rl modellerde alt havaland rma klapesi ekil 8 kapal olmas art ile s otomatik ayarlan r 3 16 Tekrar yanman n h zland r lmas i in veya yak t ilavesi gerekti inde Baca Klapesi ile alt...

Page 10: ...TUN B LEK DOMAN L NY T ORHANEL BEYPAZARI AN SEY R MER L NY T ELB STAN KELE KOK 1 3 oran nda Sibirya k m r ne kar m KOK 1 3 oran nda Linyit ile kar m ODUN Hu 6650 7900 Kcal h Hu 6500 7000 Kcal h Hu 32...

Page 11: ...anmamal ve tek dirsek tavsiye edilir K l ekmecesi varsa iptal edin YANLI DO RU ekil 11 nbisat Ba lant s nbisat kazana en az 1 derece e imle ba lanmal ekil 11 at mahyas en az 80cm olmal d r duman k pen...

Page 12: ...ft r 4 Kaloriferli soba yeni yak lm t r ve dolay s yla duvarlar so uk oldu u i in kaloriferi soban n iyi bir s ya ula mas gecikmektedir 1 6 000 7 000 kcal saat portakal veya ceviz ebad nda k m r kull...

Page 13: ...derece ye kt ktan sonra uzun s re s cak kullan m suyu al nabilir 6 YAKIT YANMA KAL TEN Z NASIL iyi bir yanmada yanma tutu ma safhas ndan sonra alev k rm z veya portakal rengi olur Kor k m r g z kama t...

Page 14: ...bayii acentas temsilcili i ithalat s veya imalat s reticisinden birisine bildirim tarihinden itibaren ba lar r n ar zas n n belirtilen g n i erisinde giderilememesi halinde imalat retici veya ithalat...

Page 15: ......

Page 16: ...MODEL NO YS 02 202 201 OPERATING MANUAL Please do not use your Central Heating Stov before reading this manual www yakarsoba com...

Page 17: ...We thank you for choosing Yakar Products You will always obtain maximum output When you read this Operating Manual prepared to assist you and as long as you comply with the instructions in it...

Page 18: ...ALLATION CONNECTION DIAGRAM 4 ELECTRICAL DIAGRAM 5 SELECTING THE LOCATION TO PLACE AND INSTALLATION INSTRUCTIONS 6 OPERATING CENTRAL HEATING STOVE 7 8 WARNING and RECOMMENDATIONS 9 CHIMNEYS and POINTS...

Page 19: ...water is sent from the Internal Boiler 1 to the External Boiler 2 and then to the radiators with the pressure of the Pump 4 Additionally utility water is constantly heated with the aid of the serpenti...

Page 20: ...t D k m Kapak 7 Kuruve 14 Kazana So uk Su k 6 A k Genle me Kazan 13 Kazana s cak Su ak s 5 n Kapak Bakalit Kulp 12 Hava k s 4 Alt Maiolik Emave Kapak 11 R1 K resel Vana 3 st Maiolik Emave Kapak 10 Pom...

Page 21: ...YS 02 and 2020 CENTRAL HEATING INSTALLATION CONNECTION DIAGRAM CD Figure 3...

Page 22: ...rating Pressure bar 1 2 1 2 1 2 2 1 A durable tray capable of carrying the weight and heat resistant for Central Heating Stove must be placed under 2 2 Distance of Central Heating Stove from the wall...

Page 23: ...ro degree 3 2 Valve must be opened in order to give water to the system Figure 1 9 from service water line Valve must be closed when 1 4 of the expansion tank Figure 1 12 gets filled 3 3 By removing b...

Page 24: ...r the coal fully burns Top Ventilation Inlet Figure 7 is closed and heat adjustment is done with Bottom Ventilation Flap 3 15 When more slowing is desired in the combustion Chimney Flap is also brough...

Page 25: ...3 rate WOOD Hu Hu Hu Hu Hu Hu Hu Hu 6650 7900 6500 7000 3200 4500 2500 3200 1100 2500 7000 7300 4500 5500 2000 3500 Kcal h Kcal h Kcal h Kcal h Kcal h Kcal h Kcal h Kcal h HA 6 a a Good Draft b Avera...

Page 26: ...AND CORES AREN T GETTING HEATED ALTHOUGH HEAT INDICATOR IS HIGH External Boiler is full of air Pump can not pump the water Please refer to 3 5 LAST CORE IS NOT GETTING WARM 1 Horizontal pipe coming to...

Page 27: ...n or to either one of the seller dealer representative importer or manufacturer producer of the product when there is no service station If the malfunction of the product can not be eliminated within...

Page 28: ......

Reviews: