ENGLISH
14
Operation
Filling the system
Regulation of the
electrical heater
Diaphragm pressure
expansion tank (6l)
Steplessly settable,
highly efficient
circulating pump with
spherical motor
Ground fault circuit
interrupter
Heat exchanger
Connection
1" male
thread
Connection
1" male
thread
Electrical heater EPR2
S.O.S. mobile heater EPE2
Supply heater
Rp 1''
Safety valve
3 bar
Filling tap
Return heater
Rp 1”
Drain tap
Regulation of the
electrical heater
Diaphragm pressure
expansion tank (6l)
Steplessly settable,
highly efficient
circulating pump
with spherical
motor
Ground fault circuit
interrupter
Heat exchanger
EPE2
1. Ensure that all stopcocks are
closed.
2. Connect the filling hose to the
KFE of the return flow fittings.
3. Connect a hose to the KFE of the
intake flow fittings.
4. Open the stopcocks and fill the
unit via the return flow. you can
vent the unit using the hose
connected to the intake.
5. Check the unit’s pressure
manometer during the filling
process.
EPR2
1. Please fill and vent the unit via
the on-site system.
2. Check the pressure manometer
during the filling process.
Summary of Contents for Lowara EPE2 16
Page 23: ...23...