![Xylem LOWARA e-SV Series Installation, Operation And Maintenance Manual Download Page 3](http://html2.mh-extra.com/html/xylem/lowara-e-sv-series/lowara-e-sv-series_installation-operation-and-maintenance-manual_4218054003.webp)
en - Original instructions
e-SV series - Installation, Operation and Maintenance Manual
3
Positive suction head installation
Checking the direction of rotation (three-phase motors)
.............................................................................. 28
Maintenance every 4000 hours of operation, or every year
.......................................................................... 31
Tightening torques of the threaded connections
........................................................................................... 32
The differential protection device (RCD) is activated
................................................................................... 33
The thermal overload protection triggers or the fuses trip
........................................................................... 34
The thermal overload protection triggers
The unit runs but there is little or no flow rate
............................................................................................. 34
When switched off, the unit turns in the opposite direction
........................................................................ 35
The unit produces excessive noise and/or vibrations
.................................................................................... 35
The unit starts up too frequently (automatic start/stop)
............................................................................. 35
The unit never stops (automatic start/stop)
The motor becomes excessively hot
The frequency converter is in error mode or turned off
............................................................................... 37
Permitted liquid temperatures for the mechanical seal
................................................................................ 38
Maximum number of starts per hour
Permitted tolerances for the supply voltage
................................................................................................. 40
Materials in contact with the liquid
Pump unit EC Declaration of Conformity (Original)
....................................................................................... 43
Summary of Contents for LOWARA e-SV Series
Page 1: ...Installation Operation and Maintenance Manual e SV Series Multistage Vertical Pump Unit...
Page 36: ...en Original instructions 36 e SV series Installation Operation and Maintenance Manual...
Page 46: ...en Original instructions 46 e SV series Installation Operation and Maintenance Manual...
Page 47: ...en Original instructions e SV series Installation Operation and Maintenance Manual 47...