en – Original Instructions
10
e-IXP, e-IXPC, e-IXPF series – Additional Installation, Operation and Maintenance Instructions
Preparing the unit for lifting
1.
Depending on the model:
•
Attach the shackles to the eyelets, if any, and attach the ropes to the shackles, or
•
Use the ropes to make a tie harness.
The figure shows how to harness and lift the different models.
2.
Fix the ropes to the crane.
3.
Lift the crane and tension the ropes without lifting the unit.
Lifting and positioning
1.
Lift and move the unit slowly
2.
Set the unit down slowly.
3.
Depending on the model:
•
Release the ropes from the shackles, or
•
Release the harness.