![Xylem AC Fire Pump 8100 Series Installation, Operation And Maintenance Manual Download Page 32](http://html1.mh-extra.com/html/xylem/ac-fire-pump-8100-series/ac-fire-pump-8100-series_installation-operation-and-maintenance-manual_3956074032.webp)
Series 8100/8150/8200/9100 Fire Pump
31
AC6102 Rev 0
5
Check the shaft to ensure that it can be rotated after fitting
each packing ring.
Fit as many rings as possible into the stuffing box without
having any packing protruding, and without over-compressing
the packing
NOTE:
The last ring in each box may not be required until
after the pump has operated for a period of time.
NOTE:
When supplied, the seal cage will replace the third
packing ring from the bottom of the stuffing box. The seal
cage must be aligned with the seal water inlet when the
packing is compressed.
Bring the gland follower up squarely against the last packing
ring and tighten the nuts evenly to finger pressure.
9.4.5
Packing Adjustment
Install the proper flush set up. Start the pump and allow the
packing to leak freely at start-up. During the break-in period,
adjustments should be made gradually (tightening the gland
nuts one 1/4 revolution at a time), allowing 5 to 10 minutes
between adjustments.
After the break-in period, the leakage rate can be controlled
to 40 to 60 drops per minute.
Summary of Contents for AC Fire Pump 8100 Series
Page 2: ...Series 8100 8150 8200 9100 Fire Pump 1 AC6102 Rev 05...
Page 4: ...Series 8100 8150 8200 9100 Fire Pump 3 AC6102 Rev 05...
Page 8: ...Series 8100 8150 8200 9100 Fire Pump 7 AC6102 Rev 05...
Page 41: ...AC6102 Rev 05 40 Table 14 Troubleshooting List...
Page 50: ...Series 8100 8150 8200 9100 Fire Pump 49 AC6102 Rev 05 A Appendix...