P91 Lead Acid 2U User
’
s Manual
Uninterruptible Power Supply
Xtreme Power Conversion Corporation
Page 4
2. Installation and setup
NOTE:
Before installation, please inspect the unit. Be sure that nothing inside the package is damaged.
Please keep the original package in a safe place for future use.
2-1. Rear panel view
P91g models:
1500 Model
2000 Model
3000 Model
P91 models:
1000/1500 Model
2000 Model
3000 Model
1. Programmable outlets: connect to non-critical loads.
2. Output receptacles: connect to mission-critical loads.
3. AC input
4. Network/Fax/Modem surge protection