CHAPTER 5 CONTROL PANEL OPERATION
5.1 Control panel operation instructions:
1 )
.,
ower switch(Equipment front)
When you turn the power switch 90
°
clockwise, the machine will power on, at this time
the panel parameter can be set and machine can be moved, the temperature controller
working, when you tum the power switch 90
°
counter �lockwise, the machine will
power off.
2)
Start/stop switch(Equipment front)
3)
When press this start/stop switch, the machine will start, the button light will be on,
when you press it again, the machine will stop, and the button light will be off.
[CAUTION]
If
you want to start the machine, you must close the
film
transport cylinder by
hand, otherwise, you can't start the machine, please refer to the manual operation
section for the detailed operation.
If the malfunction or emergency occur when the machine moving, press the emergency
switch, the machine will stop immediately. And the touch screen will display
"Emergency Stop!!" Unlock the switch (press the emergency switch and tum right), the
machine will start again, at that time "Emergency Stop! ! " will disappear
NOTICE: Please make sure that the thermal layer has been filled with water fully before
starting the function.
Temperature control (PID control) operation instruction:
XtraVac RBF8 Rotary Bagger Operation, Service, & Parts Manual
XtraVac Packaging Machines
RBF8 - Rotary Bag Filling & Sealing Machine
419 E. 11th Ave. North Kansas City, MO 64116 USA
+1 800-728-2999 • [email protected]