Installation Checklist
Site Name
Address
Detector Serial Number(s) and Date of
Manufacture
Name of Installer
Signature
Date
Perform the following checks listed below to ensure that all the necessary items are completed before handing
over to a commissioning engineer.
Installation Checks
Yes
No
Were the detector and the mounting bracket intact in the box?
Is the detector securely locked onto its mounting bracket?
Is the sampling air pipe firmly connected to the air inlet port? Ensure
the pipe is NOT glued.
Have the power wires been connected to the correct terminals on the
detector?
If required, has the end of line resistor been connected?
Have the alarm signaling wires been terminated to the correct
terminals of the detector?
Has the plug at the exhaust port been removed and the exhaust pipe
(if fitted) not glued?
Has the front cover been replaced correctly?
Is the air sampling pipework installed and checked as per the site
plans?
Summary of Contents for XCC-010
Page 1: ...Xtralis Class C XCC Product Guide XCC 010 XCC 01000 MRN May 2011 D N 14159_07 P N 29185 ...
Page 2: ......
Page 6: ...XCC Product Guide Xtralis Pty Ltd iv www xtralis com This page is intentionally left blank ...
Page 8: ...XCC Product Guide Xtralis Pty Ltd 2 www xtralis com This page is intentionally left blank ...
Page 14: ...XCC Product Guide Xtralis Pty Ltd 8 www xtralis com This page is intentionally left blank ...
Page 24: ...XCC Product Guide Xtralis Pty Ltd 18 www xtralis com This page is intentionally left blank ...
Page 26: ...XCC Product Guide Xtralis Pty Ltd 20 www xtralis com This page is intentionally left blank ...