Scope

The ICAM Commissioning Guide outlines the commissioning process for the ICAM system. It will guide you
through the commission process and the completion of commissioning documentation. The guide also
provides information on the approval and handover of commissioned ICAM systems.

The Commissioning Guide helps with the commissioning and management of the ICAM system.

This guide assumes that you have attended accredited ICAM training on commissioning and are
knowledgeable about the ICAM product range. This guide also assumes that you have an understanding of
the various aspects of an aspirating smoke detection system and are fully aware of the local codes and
standards.

To commission the ICAM system you must have the necessary certification issued by Xtralis or an
authorized distributor. Commissioning before you receive the appropriate training may void the warranty.

Document Conventions

The following typographic conventions are used in this document:

Convention Description

Bold

Used to denote:

emphasis.

Used for names of menus, menu options, toolbar buttons

Italics

Used to denote:

references to other parts of this document or other

documents. Used for the result of an action.

The following icons are used in this document:

Convention Description

Caution:

This icon is used to indicate that there is a danger to

equipment. The danger could be loss of data, physical damage, or
permanent corruption of configuration details.

Warning:

This icon is used to indicate that there is a danger of electric

shock. This may lead to death or permanent injury.

Warning:

This icon is used to indicate that there is a danger of inhaling

dangerous substances. This may lead to death or permanent injury.

Contact Us

UK and Europe

+44 1442 242 330

D-A-CH

+49 431 23284 1

The Americas

+1 800 229 4434

Middle East

+962 6 588 5622

Asia

+86 21 5240 0077

Australia and New Zealand

+61 3 9936 7000

www.xtralis.com

Summary of Contents for ICAM IFT

Page 1: ...ICAM Commissioning Guide May 2018 Document 14972_02 Part Number 29303...

Page 2: ......

Page 3: ...uipment damage Xtralis is not responsible and cannot be held accountable for any liability that may arise due to improper use of the equipment and or failure to take proper precautions Only persons tr...

Page 4: ...before you receive the appropriate training may void the warranty Document Conventions The following typographic conventions are used in this document Convention Description Bold Used to denote emphas...

Page 5: ...fore going to the Site 7 3 2 ICAM Commissioning Form Prerequisites 7 3 3 Once on Site 7 4 System Configuration and Setting Thresholds 9 4 1 IFT Detector Configuration 10 4 2 ILS Detector Configuration...

Page 6: ...ICAM Commissioning Guide ICAM by Xtralis 2 www xtralis com This page is intentionally left blank...

Page 7: ...CAM system installation It forges together the elements of designing and installing a pipe network installing the detectors cabling for power and communications and the powering up of the system Your...

Page 8: ...ICAM Commissioning Guide ICAM by Xtralis 4 www xtralis com This page is intentionally left blank...

Page 9: ...r site Gather site information Obtain a copy of l Pipe network design records l Pipe network installation form l Site plans and pipe layout plans Start to fill in l Commissioning forms l Any regulator...

Page 10: ...ICAM Commissioning Guide ICAM by Xtralis 6 www xtralis com This page is intentionally left blank...

Page 11: ...Section 5 1 10 Optional Digital manometer if sample hole pressure is required to be measured l Wide Bore networks Max range 3kpa l Narrow Bore networks 0 20kpa at the end of the recommended length of...

Page 12: ...ors l All LEDs turn on then off about five times and the sounder beeps about five times l Aspirator starts l Fault indicators are activated for current faults l Smoke levels are indicated on the bargr...

Page 13: ...y be configured via the detector s user interface Where possible air flow thresholds and smoke alarm thresholds should be determined using ASPIRE pipe network configuration software When an ICAM detec...

Page 14: ...ntrol functions require the user to enter an Access Code There are several levels of access 1 Operator 2 Level 1 3 Level 2 4 Level 3 Access Code Levels are downwards applicable for example if a User e...

Page 15: ...relating to air flow is set through the CONFIGURE menu option Some of the key parameters are l FLOWDEL Flow Fault Delay 1 to 60 s l FLOWHI FLOWLO High and low air flow limits for declaring a Flow Faul...

Page 16: ...ED flashes continuously to indicate the function selected To enable updates to the system enter the three digit access code 510 To enter numbers into the system each number must be sequentially select...

Page 17: ...y for 1 sec to initialize function selection Press and release SELECT key to sequentially step through functions Press and release CHANGE key to modify setting The relevant LED flashes continuously to...

Page 18: ...ICAM Commissioning Guide ICAM by Xtralis 14 www xtralis com This page is intentionally left blank...

Page 19: ...Very sensitive sites can use the electrical overload PVC coated wire burn test or the smouldering test coil test UK customers can refer to BS 6266 BFPSA Code of Practice Appendix A for system perform...

Page 20: ...suitable for the testing of high and enhanced sensitivity environments Smoke is produced by lighting a number of small smoke pellets You will need smoke pellets a tray and a method to time the test I...

Page 21: ...esign Legend A 500mm 20 in B Kitchen foil in tray C 20mm 0 874 in Figure 5 2 Polyurethane Mat Smoke Test 5 1 5 Wire Burn Smoke Testing This test is performed by using a transformer to overload the pow...

Page 22: ...g the above test procedure Enter the following results on the commissioning form l Transport Time Introduce smoke at the furthest sampling hole from the detector The time taken in seconds for the smok...

Page 23: ...5 2 Testing Devices The outputs for the IFT detectors can be tested using a diagnostic test that is accessed through the TEST OUTPUTS menu function For more information please see the IFT Product Gui...

Page 24: ...ICAM Commissioning Guide ICAM by Xtralis 20 www xtralis com This page is intentionally left blank...

Page 25: ...ssioning forms are complete and all relevant sections have been filled in l If you have used Xtralis VSC select the Device or Address then select File Print to print out a copy of configuration detail...

Page 26: ...ICAM Commissioning Guide ICAM by Xtralis 22 www xtralis com This page is intentionally left blank...

Reviews: