12
ML605/SP605 Hardware Tutorial
UG669 (v3.0) March 15, 2011
Executing the System
shows the resulting output for ML605 on the serial communication terminal
utility program.
shows the resulting output for SP605 on the serial
communication terminal utility program
Note:
The LED Test (option 2) loops through the LEDS two times and returns to the menu when
complete. The Ethernet Loopback Test (option 6) takes 30 seconds to complete after displaying
the initial setup message. (The Ethernet Loopback Test hangs if jumpers are not set for GMII.)
The External Memory Test (option 8) takes approximately 25 minutes to complete.
X-Ref Target - Figure 4
Figure 4:
Board Test Application Menu for ML605
X-Ref Target - Figure 5
Figure 5:
Board Test Application Menu for SP605
UG669_04_092110
UG669_05_092110