change the value, change the data to 00400, and then press [ENT] for more than 2s to complete
the setting.
;
To understand frequency transmitter operation instructions,
please refer to the TA-MF series SetPro microcomputer-based
frequency isolation transmitter instruction manual.
5) The operating table adjusts the speed about 1500r/min;
6) Install the top iron and the stopper on the main top device so that the two main top oil
cylinders can run synchronously;
7) Enter the "rotation angle correction" interface, operate the main top cylinder retract to
the end, make a mark, the main top cylinder advances for 1 minute to stop, measure the amount
of advancement of the main top cylinder (unit mm), this data is the advancing speed mm/ Min,
fill this data into step 1;
If the two main jacking cylinders cannot be synchronized, the two main jacking cylinders are
added together and divided by two.
8) The main jacking cylinder continues to advance, and when the
frequency transmitter data is stable, press [OK] in step 2;
9) The main jacking cylinder retreats to the end, according to step 3 of
the [return to zero];
10) The main jacking cylinder is advanced to the end, measure the actual extension of the
main top (mm), fill in the data column of step 4, and press [to obtain the forward
distance];
11) After the main jacking cylinder is back to the end, press [OK] in step 5.
59
Summary of Contents for XDN450
Page 1: ... Xuzhou Construction Machinery Group Co Ltd XDN450 Pipe Jacking Operation Manual ...
Page 23: ... 4 Electric control cabinet Unit mm 5 Main pump station Unit mm 2 ...
Page 24: ... 3 ...
Page 36: ... Chapter Three Operational Instruction 3 1 Device installation 3 1 1 System structure 15 ...
Page 40: ... 4 Check if the voltage is 220V 5 The main switch in the electric control cabinet 19 ...
Page 70: ... 49 ...
Page 71: ... Enter the X coordinate area Enter the current area 50 ...
Page 72: ... 51 ...
Page 73: ... Enter the thrust area Enter the propulsion speed area 52 ...
Page 74: ... Enter the Advance Form area Enter the Alert Table area 53 ...
Page 90: ... 4 2 The maintenance schedule of machine 69 ...
Page 102: ... Cutting head 81 ...
Page 103: ... Main jacking device 82 ...
Page 104: ... Console Electric control cabinet Main pump station 83 ...
Page 106: ... Appendix A Electrical schematic diagram XDN450 Electrical schematic diagram 85 ...
Page 107: ... XDN450 Electrical schematic diagram 86 ...
Page 108: ... XDN450 Electrical schematic diagram 三 87 ...
Page 109: ... XDN450 Electrical schematic diagram 四 88 ...
Page 110: ... XDN450 Electrical schematic diagram 五 89 ...
Page 111: ... XDN450 Electrical schematic diagram 六 90 ...
Page 112: ... XDN450 Electrical schematic diagram 七 91 ...
Page 113: ... XDN450 Electrical schematic diagram 92 ...
Page 114: ... XDN450 Electrical schematic diagram 九 93 ...
Page 115: ... XDN450 Electrical schematic diagram 94 ...
Page 116: ... XDN450 Electrical schematic diagram 95 ...
Page 117: ... XDN450 Electrical schematic diagram 96 ...
Page 118: ... XDN450 Electrical schematic diagram 三 97 ...
Page 119: ... XDN450 Electrical schematic diagram 四 98 ...
Page 120: ... XDN450 Electrical schematic diagram 五 99 ...
Page 121: ... XDN450 Electrical schematic diagram 六 100 ...
Page 122: ... Appendix B Hydraulic schematic diagram XDN450 Machine hydraulic schematic diagram 101 ...
Page 123: ... XDN600 Machine hydraulic schematic diagram 102 ...
Page 124: ... XDN450 Main top hydraulic schematic diagram 103 ...
Page 126: ... 105 ...