3.2 Equipment safety inspection
3.2.1 Check if that all threaded connections are tight and the pins are secure.
3.2.2 Check if the grease, lubricating oil, etc. are adequate.
3.2.3 Check if the hydraulic oil is sufficient and if the hydraulic oil circuit leaks.
3.2.4 Check if r the operation and instrument display are normal.
3.2.5 Check if the function and status of each device component are normal.
3.2.6 Check supply voltage: Three-phase AC220V, Frequency: 60Hz
Incorrect power supply voltage will cause damage to the
equipment and even cause electric shock or other hazards.
3.2.7 Check if the supporting facilities are complete and if they correspond the safety
requirements. The supporting facilities are as follows:
1) Laser emitters. Required battery device must have enough spare batteries.
2) Random spare parts box and tool box.
3) Pipes, seals, sealants and connecting devices.
4) Mud supporting facilities, such as mud pump, mud pump, mud pump, grouting pipe,
pipe card, water source, mixing station, Pengrun soil, polymerization agent and other
added materials.
5) Flag or self-painting.
6) Insulated boots and insulating gloves.
7) Notebook and pen.
8) Fire extinguisher.
9) Power supply and lighting equipment.
3.3 Start machine
1
)
After ensuring that the power supply is connected in normal condition, open the
control cabinet and turn the power switch QF0 (located in the upper left of the control cabinet)
to the ON position to turn on the power.
20
Summary of Contents for XDN450
Page 1: ... Xuzhou Construction Machinery Group Co Ltd XDN450 Pipe Jacking Operation Manual ...
Page 23: ... 4 Electric control cabinet Unit mm 5 Main pump station Unit mm 2 ...
Page 24: ... 3 ...
Page 36: ... Chapter Three Operational Instruction 3 1 Device installation 3 1 1 System structure 15 ...
Page 40: ... 4 Check if the voltage is 220V 5 The main switch in the electric control cabinet 19 ...
Page 70: ... 49 ...
Page 71: ... Enter the X coordinate area Enter the current area 50 ...
Page 72: ... 51 ...
Page 73: ... Enter the thrust area Enter the propulsion speed area 52 ...
Page 74: ... Enter the Advance Form area Enter the Alert Table area 53 ...
Page 90: ... 4 2 The maintenance schedule of machine 69 ...
Page 102: ... Cutting head 81 ...
Page 103: ... Main jacking device 82 ...
Page 104: ... Console Electric control cabinet Main pump station 83 ...
Page 106: ... Appendix A Electrical schematic diagram XDN450 Electrical schematic diagram 85 ...
Page 107: ... XDN450 Electrical schematic diagram 86 ...
Page 108: ... XDN450 Electrical schematic diagram 三 87 ...
Page 109: ... XDN450 Electrical schematic diagram 四 88 ...
Page 110: ... XDN450 Electrical schematic diagram 五 89 ...
Page 111: ... XDN450 Electrical schematic diagram 六 90 ...
Page 112: ... XDN450 Electrical schematic diagram 七 91 ...
Page 113: ... XDN450 Electrical schematic diagram 92 ...
Page 114: ... XDN450 Electrical schematic diagram 九 93 ...
Page 115: ... XDN450 Electrical schematic diagram 94 ...
Page 116: ... XDN450 Electrical schematic diagram 95 ...
Page 117: ... XDN450 Electrical schematic diagram 96 ...
Page 118: ... XDN450 Electrical schematic diagram 三 97 ...
Page 119: ... XDN450 Electrical schematic diagram 四 98 ...
Page 120: ... XDN450 Electrical schematic diagram 五 99 ...
Page 121: ... XDN450 Electrical schematic diagram 六 100 ...
Page 122: ... Appendix B Hydraulic schematic diagram XDN450 Machine hydraulic schematic diagram 101 ...
Page 123: ... XDN600 Machine hydraulic schematic diagram 102 ...
Page 124: ... XDN450 Main top hydraulic schematic diagram 103 ...
Page 126: ... 105 ...