!
Chapter One Safety part
This manual in the first part lists safety requirements and any users must observe these
safety requirements when operating the machine so as to minimize possible dangers and injuries!
We adclamp any operator should carefully read this instruction manual in advance,
especially the parts with regard to safety, and operation of the machine, otherwise it may bring
you some unnecessary bothering due to some minor mistakes.
Do’s and Don’ts
:
1.Users must operate XDN450 pipe jacking machine in accordance with instruction
manual.Any other usages are forbidden.
2.Workers must observe the safety requirements in assembling the machine.
3.The unauthorized or untrained are not allowed to operate it.
4.Construction personnel must wear appropriate safety clothing, such as rubber insulating
gloves and boots.
5.Please keep the control panel, pedal plate and handle clean, and regularly check the oil
channels and lubrication grease to avoid possible dangers.
6.Joystick and rubber pipe can’t be used as handle to avoid any mistakes in operation.
7.Please line out the construction area in advance and set some warning marks around it.
8.When two people conduct the operation and maintenance at the same time, one should
monitor the other’s security and operation.
9.Only when the whole set of machine is off power, user can conduct maintenance work
alone.
10.In maintenance, monitors can touch the emergency stop switch in any time.
11.There should be adequate lighting in the construction areas.
12.The operator and monitor should keep in good connection and be familiar with signal-
sending ways.
13.Please check the emergency stop switch before and after usage.
To prevent electric shock, please ensure that the console and the electric control cabinet are
grounded before operation, and be sure to use the attached grounding copper rod to avoid danger.
Product information
!
16
Summary of Contents for XDN450
Page 1: ... Xuzhou Construction Machinery Group Co Ltd XDN450 Pipe Jacking Operation Manual ...
Page 23: ... 4 Electric control cabinet Unit mm 5 Main pump station Unit mm 2 ...
Page 24: ... 3 ...
Page 36: ... Chapter Three Operational Instruction 3 1 Device installation 3 1 1 System structure 15 ...
Page 40: ... 4 Check if the voltage is 220V 5 The main switch in the electric control cabinet 19 ...
Page 70: ... 49 ...
Page 71: ... Enter the X coordinate area Enter the current area 50 ...
Page 72: ... 51 ...
Page 73: ... Enter the thrust area Enter the propulsion speed area 52 ...
Page 74: ... Enter the Advance Form area Enter the Alert Table area 53 ...
Page 90: ... 4 2 The maintenance schedule of machine 69 ...
Page 102: ... Cutting head 81 ...
Page 103: ... Main jacking device 82 ...
Page 104: ... Console Electric control cabinet Main pump station 83 ...
Page 106: ... Appendix A Electrical schematic diagram XDN450 Electrical schematic diagram 85 ...
Page 107: ... XDN450 Electrical schematic diagram 86 ...
Page 108: ... XDN450 Electrical schematic diagram 三 87 ...
Page 109: ... XDN450 Electrical schematic diagram 四 88 ...
Page 110: ... XDN450 Electrical schematic diagram 五 89 ...
Page 111: ... XDN450 Electrical schematic diagram 六 90 ...
Page 112: ... XDN450 Electrical schematic diagram 七 91 ...
Page 113: ... XDN450 Electrical schematic diagram 92 ...
Page 114: ... XDN450 Electrical schematic diagram 九 93 ...
Page 115: ... XDN450 Electrical schematic diagram 94 ...
Page 116: ... XDN450 Electrical schematic diagram 95 ...
Page 117: ... XDN450 Electrical schematic diagram 96 ...
Page 118: ... XDN450 Electrical schematic diagram 三 97 ...
Page 119: ... XDN450 Electrical schematic diagram 四 98 ...
Page 120: ... XDN450 Electrical schematic diagram 五 99 ...
Page 121: ... XDN450 Electrical schematic diagram 六 100 ...
Page 122: ... Appendix B Hydraulic schematic diagram XDN450 Machine hydraulic schematic diagram 101 ...
Page 123: ... XDN600 Machine hydraulic schematic diagram 102 ...
Page 124: ... XDN450 Main top hydraulic schematic diagram 103 ...
Page 126: ... 105 ...