Revision A
31
Section 2. Installation
Basic Setup Procedure
See
Table 2.1
for a summary of the basic setup procedure and an overall view of the
information in this section. Use the procedure as a quick reference if you are familiar
with the installation requirements for the power supply. If you want more
information, each step in the procedure refers to sections which contain more details.
Execute each step in the sequence given.
Table 2.1
Basic Setup Procedure
Step # Description Action
Reference
1
Inspection
Perform an initial physical
inspection of the supply.
“Initial Inspection” on
page 32
2
Installation
Install the supply (bench or rack
mount); ensure adequate
ventilation.
“Location, Mounting,
and Ventilation” on
page 35
3
Input Power
Connect AC input power.
“AC Input Power” on
page 36
4
Test
Perform functional tests for voltage
mode operation, current mode
operation, and front panel controls.
“Functional Tests” on
page 37
5
Load
Connect the load.
“Load Connection” on
page 39
6
Sensing
Connect sensing lines.
“Local and Remote
Sensing” on page 48
TM-XROP-01XN.book Page 31 Monday, March 22, 2004 4:10 PM
Summary of Contents for XHR 100-10
Page 2: ......
Page 3: ...Operating Manual for XHR Series Programmable DC Power Supply...
Page 14: ...List of Figures xii Operating Manual for XHR Series Power Supply...
Page 16: ...List of Tables xiv Operating Manual for XHR Series Power Supply...
Page 49: ...Installation Load Connection Revision A 47 Figure 2 9 Multiple Loads with Remote Sensing...
Page 85: ......