
ACS Control Panel
12
Prosine 2.5/3.0 Installation & Operation Guide
ACS Control Panel
The Advanced Control System (ACS) panel features a two-line 16-character liquid crystal display
(LCD) that enables you to monitor and control your Prosine inverter/charger from a remote location. It
comes standard with a 50-foot (15-metre) four-conductor telephone cord. The ACS control panel
provides you with a finer degree of both monitoring and operating control over the standard control
panel. If you purchased a Prosine 3.0, it comes with the ACS panel in place of the standard panel. The
digital readout of the ACS gives you a detailed display of many parameters for the system, while the
menu structure allows advanced configuration as well as the convenience to change system settings
when you need to.
CAUTION
Configuration settings made with the ACS panel will override settings made by
configuring the DIP switches on the side of the chassis.
The ACS Panel has a backlight to facilitate reading. The backlight for the LCD panel illuminates
when any key on the ACS is pressed. The backlight will remain on for one minute after the last key
press, or after a warning has been displayed.
Summary of Contents for Prosine PS2.5 and
Page 1: ...Xantrex ProsineTM 2 5 and 3 0 Inverter Chargers Installation and Operation Guide PS2 5 PS3 0...
Page 2: ...ProsineTM PS2 5 Inverter Charger PS3 0 Inverter Charger Installation and Operation Guide...
Page 9: ...vi Prosine 2 5 3 0 Installation Operation Guide Figure 1 Inverter Charger Components...
Page 13: ...Return Procedure x Prosine 2 5 3 0 Installation Operation Guide...
Page 21: ...Inverter Features 4 Prosine 2 5 3 0 Installation Operation Guide...
Page 41: ...Battery Temperature Sensor 24 Prosine 2 5 3 0 Installation Operation Guide...
Page 75: ...Operating Limits for Inverter Operation 58 Prosine 2 5 3 0 Installation Operation Guide...
Page 83: ...Operating Limits for Charger Operation 66 Prosine 2 5 3 0 Installation Operation Guide...
Page 95: ...Cabling Hook up Configurations 78 Prosine 2 5 3 0 Installation Operation Guide...
Page 101: ...84 Prosine 2 5 3 0 Installation Operation Guide...
Page 111: ...Error Code Table 94 Prosine 2 5 3 0 Installation Operation Guide...