12

Freedom Sequence Intelligent Power Manager Installation Guide

Installing the Freedom Sequence

Figure 6

Switch and Disconnect Locations

GENERATOR

30A

MAIN AC

PANEL

2-PHASE
PLUG

BREAKER 50A

AC IN

AC IN

AC OUT

AC IN

AC OUT

SHORE POWER

LAND-BASED
BREAKER 50A

2-PHASE
RECEPTACLE

INVERTER

SUBPANEL

FREEDOM

SW

   

 

3012

FREEDOM

 

SW

    

3012

                   

 In

ve

rte

r   

   Reset       Enable    

Inv

er

te

r     A

C/

     On      

Char

ge   F

ault

 

Inverter/Charger

MAIN AC

PANEL

BATTERY

BREAKER

AC IN

AC IN

AC OUT

AC OUT

ELECTRICAL SHOCK HAZARD

Turn off switches and open all disconnects including circuit panel 
breakers prior to wiring or servicing.

Failure to follow these instructions will result in death or serious 
injury.

FIRE AND ELECTRICAL HAZARD

• Install in a controlled environment relatively free of contaminants.
• AC input wiring must be provided with a reliably grounded conductor.
• Compartments, raceways, and the like, for routing and stowage of conductors 

connected in the field shall not contain rough, sharp, or moving parts that may 
damage conductor insulation.

• Use only copper conductors, properly sized for the main 50-amp rated AC 

input branch circuit, and the 15-amp rated AC relay branch circuits.

• All AC relay circuits must have a common disconnect and be connected to the 

same pole of the disconnect (i.e. Main AC Panel).

Failure to follow these instructions can result in death or serious 
injury.

FSequence IPM Install Guide.book  Page 12  Thursday, October 6, 2011  3:21 PM

Summary of Contents for Freedom Sequence

Page 1: ...eedom Sequence Intelligent Power Manager Installation Guide Freedom Sequence with six AC relays PN 809 0912 shown 809 0912 809 0913 PNs FSequence IPM Install Guide book Page i Thursday October 6 2011...

Page 2: ...FSequence IPM Install Guide book Page ii Thursday October 6 2011 3 21 PM...

Page 3: ...umentation UNLESS SPECIFICALLY AGREED TO IN WRITING XANTREX TECHNOLOGY USA INC XANTREX A MAKES NO WARRANTY AS TO THE ACCURACY SUFFICIENCY OR SUITABILITY OF ANY TECHNICAL OR OTHER INFORMATION PROVIDED...

Page 4: ...er should have knowledge and experience in installing electrical equipment knowledge of the applicable installation codes and awareness of the hazards involved in performing electrical work and how to...

Page 5: ...iance Failure to follow these instructions can damage the unit and or damage other equipment IMPORTANT These notes describe things which are important for you to know however they are not as serious a...

Page 6: ...uctors connected to the AC input output connections NOTE The power manager has no on off switch Circuits are always live when DC and AC input are present ELECTRICAL SHOCK HAZARD Do not expose the powe...

Page 7: ...intended for use by persons including children with reduced physical sensory or mental capabilities or lack of experience and knowledge unless they have been given supervision or instruction concernin...

Page 8: ...rmined by turning the equipment off and on the user is encouraged to try to correct the interference by one or more of the following measures Reorient or relocate the receiving antenna Increase the se...

Page 9: ...ety Instructions iv Introduction 1 Features 5 Installing the Freedom Sequence 11 Freedom Sequence SCP Menu Map 18 Specifications 19 Contents FSequence IPM Install Guide book Page i Thursday October 6...

Page 10: ...FSequence IPM Install Guide book Page ii Thursday October 6 2011 3 21 PM...

Page 11: ...DC relays via the DC auxiliary connector port which can control external DC circuits based on Battery Voltage These four DC relays can also be used to control external AC circuits2 Circuit level overr...

Page 12: ...wiring harness AC wiring terminal covers with screws and a Xanbus network terminator NOTE Keep the carton and packing material in case you need to return the power manager for servicing network termin...

Page 13: ...itions Together with the Freedom SW Series Inverter Charger the power manager provides advanced power optimization features of interactive charger de rating and automatic inverter assist to provide ad...

Page 14: ...ee below means that this product works on a Xanbus network Xanbus enabled products are Simple to operate and routine tasks are automated Controlled by software that eliminates analog signalling errors...

Page 15: ...es including the SCP AGS and Freedom SW 4 DC auxiliary connector port contains the terminals for four DC relays Generator Run B signal and DC power 5 AC relay three wire terminal blocks provide six or...

Page 16: ...INE AC DISCONNECT XANBUS DC DISCONNECT 50A 300A 300A A A NOTE The Freedom Sequence power manager must be permanently installed by a qualified installer in a controlled environment Figure 3 shows a sim...

Page 17: ...elief 2 M5 Phillips pan head mounting screw or drywall anchor or plasterboard plug Select the best mounting material suited to the type of surface 6 M5 washers at 10mm OD max 6 Condition Requirement D...

Page 18: ...ent Power Manager Installation Guide Features Figure 4 Mounting Orientations Deck or Ceiling Horizontally Flat Surface Figure 5 Mounting Orientations Wall FSequence IPM Install Guide book Page 8 Thurs...

Page 19: ...itted to be not less than the sum of the continuous load plus the noncontinuous load It is important to note that every appliance also referred to as the assembly is listed for operation at 100 percen...

Page 20: ...ing Sizes Type AWG Rating DC wire s stranded and color matched with the wire s on the DC auxiliary connector wiring harness as shown 18 5 A 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Normally Open Normall...

Page 21: ...onnect the AC Relay wires 4 Connect the DC Relay wires 5 Interconnect the Xanbus components 6 Turn on the SCP and bring the Freedom Sequence to Safe Mode 7 Configure Freedom Sequence via the SCP 8 Tur...

Page 22: ...w these instructions will result in death or serious injury FIRE AND ELECTRICAL HAZARD Install in a controlled environment relatively free of contaminants AC input wiring must be provided with a relia...

Page 23: ...ral wires of the AC Main cables as shown above If the ground wire is jacketed instead of bare strip it as well as shown above 2 Connect each wire of the AC cable meant for the breakered AC transfer sw...

Page 24: ...are hole N G L 15A 3 Starting with one end of an AC cable connect each wire into a corresponding terminal on one of the circuit breakers on the main AC panel NOTE The AC cable must be compatible with...

Page 25: ...15 16 Black Red B A T T GENERATOR 30A BATTERY 12V 5mm DC device wire s 2 4 6 8 10 12 14 16 1 3 5 7 9 11 13 15 Normally Open Normally Closed NOTE The color of the wires on each DC device may be differ...

Page 26: ...rk port Daisy chain the other components as shown 3 Terminate the daisy chain by plugging the right Xanbus network port of the last component with a network terminator NOTE In a Xanbus network the com...

Page 27: ...On Charge Fault Inverter Charger MAIN AC PANEL B SIGNAL BATT DC AUX HARNESS AGS TM SCP TM SHORE POWER LAND BASED BREAKER 30 50A 2 PHASE RECEPTACLE 2 PHASE PLUG BATTERY BREAKER BREAKER 50A BATTERY DC L...

Page 28: ...ating GEN BKR Rating GEN Warmup Delay Connect Seq Delay AC Disq Priority Nom DC Voltage Circuit1 Circuit2 Circuit3 Circuit4 Circuit5 Circuit6 Circuit7 Circuit8 Circuit9 Circuit10 Enabled 30 0A 0sec 10...

Page 29: ...DC auxiliary connector port 4 3 pin connector for each DC relay 1 2 pin connector for one Generator Run signal 1 2 pin connector for battery Environmental Specifications Operating range 20 to 50 C 4...

Page 30: ...FSequence IPM Install Guide book Page 20 Thursday October 6 2011 3 21 PM...

Page 31: ...FSequence IPM Install Guide book Page i Thursday October 6 2011 3 21 PM...

Page 32: ...Xantrex Technology USA Inc 1 800 670 0707 Tel 1 800 994 7828 Fax www xantrex com 975 0594 01 01 Printed in China FSequence IPM Install Guide book Page ii Thursday October 6 2011 3 21 PM...

Reviews: