1x
8ft (93”)
Upright Beam
1x
Flyaway Beams
2x
1ft or 2ft
Crossbeams
Connect two of the 2ft or 1ft Crossbeams to one side of an Upright Beam
and a Flyaway Beam to the other. You will repeat this step for the other
side of the rig.
STEP ONE
5x
110mm M12 Bolt
10x
M12 Washer
5x
M12 Nuts
1
2 3 4 5
Note: Steps 1 & 2 are completed with the rig horizontally on the ground.
Front/Back
J-Cup Spacing
Side Spacing
2x
Reapeat this step for the other
side of the rig
J-Cup holes facing out
X Training Equipment • [email protected] • (877) 348-7464