Operation m
anual X-TRIANGL
E
www.x-dreamfly.ch
page 15 of 39
Assembly ring system for re-packing and after an opening
1.) Assembly of the rubber band on the steel pin for fixing them afer closing the ring system.
2.) Closing the ring system
(using a short line makes this procedure easier).