Installation
System 2020 XT C
ONNECT
3 - 22
ba75970e01
10/2012
Preparing the cable ends
Fig. 3-14 Prepared cable end
Connecting the cables
The SNCIQ and SNCIQ/UG cables are connected to the terminal strip
in the same way as the SACIQ sensor connection cable (see
1
Cut off the cable to the required length.
2
Remove approx. 45 mm of cable insulation (in the case of the
SNCIQ/UG earth cable, remove both the inner and outer insu
-
lation).
3
Only for the SNCIQ/UG earth cable:
strip the outer insulation for further 35 mm.
4
Shorten the exposed shielding braid up to the cable sheath.
5
Shorten the two fillers (plastic inlays) up to the cable sheath.
6
Bare the red and green wires and fit them with wire end
sleeves.
7
Fit the filler stranded wire with a wire end sleeve.
SNCIQ
SNCIQ/UG
approx. 35 mm
approx. 45 mm
approx. 45 mm
1
Open the MIQ module.
2
Select any SENSORNET connection. At the same time, look
out for the SENSORNET designation.
Summary of Contents for IQ SENSOR NET System 2020 XT
Page 2: ...Copyright 2016 Xylem Analytics Germany GmbH Printed in Germany...
Page 8: ...Contents System 2020 XT CONNECT 0 6 ba75970e01 10 2012...
Page 24: ...Overview System 2020 XT CONNECT 1 16 ba75970e01 10 2012...
Page 28: ...Safety System 2020 XT CONNECT 2 4 ba75970e01 10 2012...
Page 123: ...System 2020 XT CONNECT Settings setup 5 11 ba75970e01 10 2012 Fig 5 10 Edit list of sensors...
Page 138: ...Settings setup System 2020 XT CONNECT 5 26 ba75970e01 10 2012...
Page 152: ...Network connection System 2020 XT CONNECT 6 14 ba75970e01 10 2012...
Page 178: ...PROFIBUS connection option System 2020 XT CONNECT 8 12 ba75970e01 10 2012...
Page 180: ...Maintenance and cleaning System 2020 XT CONNECT 9 2 ba75970e01 10 2012...
Page 194: ...What to do if System 2020 XT CONNECT 10 14 ba75970e01 10 2012...
Page 204: ...Accessories and options System 2020 XT CONNECT 12 2 ba75970e01 10 2012...
Page 212: ...Lists IQ SENSOR NET System 2020 XT CONNECT 13 8 ba75970e01 10 2012...
Page 215: ......