Original Operating Instructions
BATI0XXX-ES-1-ZZZ-1
Commissioning
O_BATI_0XXX-ES-1-ZZZ-1_V1.4_GB
Seite
41
von
60
5 Commissioning
NOTICE
Damage due to incorrect commissioning!
Incorrect commissioning can damage the product.
•
Activating the product via the interfaces is described in
„
Interface
Description Modbus TCP and EtherCAT
“
.
NOTICE
Damage to measuring device due to overvoltage!
Performing measurements with the incorrect measuring range can
cause damages.
•
Use only measuring devices with correct measuring range.
The operating modes and switching between them are carried out by external control
via the Ethernet interface. Controlling the product via the Ethernet interface is
described in the corresponding
Interface Description
.
5.1
Preparing Commissioning
Prerequisite:
•
Conditions for operation shall be fulfilled (Section 11.2).
•
At the first commissioning an initial setup via user interface is necessary.
•
The lines from the power unit to the control cabinet must be connected
(Section 3.4.1).
•
All lines and cables must be properly connected and tested on torque.
Procedure:
1.
Ensure
that the Enable switch is locked.
2.
Ensure
that the product is de-energized
3.
Open
the doors.
4.
Ensure
that all fuses are inserted (Figure 6, Figure 8).
5.
Check
that the miniature circuit breakers are in
ON
position
6.
Check
that the AC circuit breaker (
–Q2) is in
OFF
position (Figure 8).
7.
Ensure
that all cables and lines are undamaged, connected correctly and in
proper condition.
8.
Connect
the supply voltage.
9.
Connect
the batteries to the DC switch disconnector (
–Q1) (Figure 13).
10.
Connect
the product to the grid.