Installation
Greenstar i System
ErP
- 6 720 806 945 (2015/07)
31
5.3.1
Front panel removal
▶ Removing outer case
– Undo and remove the two outer screws [1] securing the
appliance casing to release the bottom of the front panel.
– Lift front panel [2] off the two locating lugs [3] on the top of the
appliance.
Fig. 28 Remove front panel
5.3.2
Hanging the appliance
▶ Hang the appliance on to the wall mounting frame by the centre hook
Fig. 29 Hanging the appliance
5.3.3
Pressure relief connections
▶ To secure in place, push the lever on the pressure relief connector UP
until the stop on the inside of the handle is over the shoulder of the
metal bracket.
Fig. 30 PRV in the up position
5.3.4
Siphon removal
Access to the siphon
▶ Loosen the captive screw securing the control panel [1].
▶ Hinge open the control panel [2] into service position.
Fig. 31 Access for removing siphon
Before Hanging the appliance.
If fitting the optional integral diverter valve kit, the
following needs to be completed:
▶ The cylinder service valve needs fitting.
▶ The internal cylinder return pipe needs fitting.
▶ See the optional integral diverter valve kit
instructions for fitting details.
CAUTION:
Hanging the appliance
▶ Remove the plastic strip fitted to pipes before
hanging the appliance.
If required, the expansion vessel can be removed to
reduce the lift weight during hanging.
For details of expansion vessel removal
(
6720806948-12.1W
o
1
2
3
6720806944-06.1W
o
NOTICE:
The pressure relief connector must be
repositioned after the appliance has been correctly
mounted to the wall mounting frame refer to figure 30.
To ease assembly of components, apply silicone
lubricant to sealing surfaces.
6720806944-12.1Wo
6720806944-1
1
.1W
o
2
1