INSTALLATION & SERVICING INSTRUCTIONS
CONTACT INFORMATION
INSTALLATION & SERVICING INSTRUCTIONS
CONTACT INFORMATION
INSTALLATION & SERVICING INSTRUCTIONS
8 716 115 219b (09.2008)
PLEASE READ THESE INSTRUCTIONS CAREFULLY BEFORE STARTING INSTALLATION.
THESE INSTRUCTIONS ARE APPLICABLE TO THE PRODUCT MODEL(S) STATED ON
THE FRONT COVER OF THIS MANUAL ONLY AND MUST NOT BE USED WITH ANY
OTHER MAKE OR MODEL OF APPLIANCE.
THE INSTRUCTIONS APPLY IN THE UK/IE ONLY AND MUST BE FOLLOWED EXCEPT
FOR ANY STATUTORY OBLIGATION.
THIS APPLIANCE MUST BE INSTALLED BY A COMPETENT REGISTERED ENGINEER,
SUCH AS A BRITISH GAS OR OTHER CORGI REGISTERED PERSONNEL.
IF YOU ARE IN
ANY DOUBT
CONTACT THE WORCESTER TECHNICAL SUPPORT
HELPLINE.
DISTANCE LEARNING AND TRAINING COURSES ARE AVAILABLE FROM WORCESTER,
PART OF THE BOSCH GROUP.
PLEASE LEAVE THESE INSTRUCTIONS, THE USER GUIDE AND THE COMPLETED
BENCHMARK LOG BOOK (AT THE BACK OF THIS MANUAL) OR A CERTIFICATE
CONFIRMING COMPLIANCE WITH IS 813 (EIRE ONLY) WITH THE USER OR AT
THE GAS METER AFTER INSTALLATION OR SERVICING.
WORCESTER, BOSCH GROUP:
MAIN RECEPTION: 01905 754624
MAIN FAX:
01905 754619
TECHNICAL:
08705 266241
SERVICE:
08457 256206
SPARES:
01905 752571
LITERATURE:
01905 752556
TRAINING:
01905 752526
SALES:
01905 752640
WEBSITE:
worcester-bosch.co.uk
WATER TREATMENT:
FERNOX 01799 550811
fernox.com
SENTINEL 0800 389 4670
sentinel-solutions.net
FLUE TERMINAL GUARDS:
TOWER FLUE COMPONENTS
VALE RISE, TONBRIDGE, TN9 1TB
TEL: 01732 351680
tfc-group.co.uk
ABBREVIATIONS:
Ø
Diameter
NG
Natural Gas
LPG
Liquid Petroleum Gas
CH
Central Heating
DHW
Domestic Hot Water
TRV
Thermostatic Radiator Valve
IP
Ingress Protection
RS
Room sealed flue
N/A
Not allowed
SEDBUK Seasonal Efficiency for Domestic Boilers in the United Kingdom
Store the appliance in a dry area prior to
installation.
THIS BOILER IS NOT SUITABLE FOR ROOF
SPACE INSTALLATION.
IMPORTANT HANDLING INSTRUCTIONS:
It is advised that at least two people are
involved in the transfer of the packaged
appliance from the van to the point of
installation.
A suitable truck should be used.
The boiler is secured to a wooden board with
screws. It is advised that no attempt should
be made to move the packaged appliance
without the use of a suitable truck.
Before removing the carton it is advised that
the top flaps are opened and the ancillary
items removed and set to one side.
The carton can now be lifted off the boiler.
Remove the plastic bag protecting the boiler
surfaces and place safely away from the
working area.
Remove the boiler (complete with board) from
the pallet before removing the securing screws.
The boiler is mounted on small wheels and
can now be slid off the board and guided into
the installation position.
Care should be taken not to damage any
panels.
Two people are required to move the appliance
from the board into the installation position.
GENERAL HANDLING GUIDELINES:
• Lift only a manageable weight, or ask for help.
• When lifting, bend the knees, and keep the
back straight and feet apart.
• Do not lift and twist at the same time.
• Lift and carry items close to the body
• Wear protective clothing and gloves to
protect from any sharp edges
SYMBOLS USED IN THIS MANUAL:
Domestic hot water
Central heating
Room thermostat
Frost thermostat
Wait time period
Programmer/timer OFF
Programmer ON CH only
Programmer ON DHW only
Programmer ON CH and DHW
Cold water main supply
Electricity supply
Fuel supply
COMMERCIAL INSTALLATION:
IF INSTALLING A GROUP OF APPLIANCES TOGETHER, ON COMMERCIAL PREMISES,
THAT TOTALS MORE THAN 70KW, THEN THE APPLIANCES MUST BE INSTALLED IN
ACCORDANCE WITH THE REQUIREMENTS OF IGE/UP/10 THEREFORE A COMMERCIAL
GAS QUALIFICATION WILL BE REQUIRED.