![Worcester 24ijunior Installation And Servicing Instructions Download Page 15](http://html1.mh-extra.com/html/worcester/24ijunior/24ijunior_installation-and-servicing-instructions_996379015.webp)
11.8 Air and Flue Duct Preparation
11.8.1
The method of installation of the flue system may be
varied to suit the actual site conditions. The instructions for
connecting and fixing the ducts must, however, be strictly
followed.
Remove all packing material from the flue components.
11.8.2
11.8.3
Fit the flue restrictor ring by unscrewing the flue spigot
from the boiler. Refer to Fig. 19.
The standard telescopic flue assembly is suitable (without
cutting) for flues from 425mm up to 725mm measured from the
centre-line of the boiler flue outlet to the outer face of the wall.
Refer to Fig. 20.
The minimum length of the standard flue, after cutting is 275mm.
If L is greater than 725mm then extension duct kit/s will be required
- each kit extends the flue by 750mm up to a maximum of 3000
mm.
EXTENSION
MAXIMUM FLUE LENGTH mm
1
1475
2
2225
3
2975
15
Fig. 19. Flue spigot and restrictor
1
2
3
4
Fig. 18. Inner case and facia fixing
Fig. 20. Standard flue assembly
L
Fixing screw
Flue
turret
assembly
Appliance casing
Telescopic adjustment
Terminal
assembly
3
1. Inner casing cover
2. Control panel fixing screws (2)
3. Inner casing cover fixing screws (2)
4. Control panel
5. Controls connector cover
6. Controls connector cover fixing screws (2)
7. Programmer (optional)
8. Facia control panel fixing screw
9. Top support lug (2)
10. Bottom support lug (2)
1
4
6
2
5
6
9
7
8
10
RESTRICTOR RINGS
Flue length
24i
28i
Horizontal up to 1m
76mm
80mm
Horizontal above 1m
None
None
Vertical terminal and up to 1m flue
76mm 80mm
Vertical flue greater than 1000mm None None
1. Flue spigot fixing screws
2. Flue spigot
3. Restrictor ring
4. Flue spigot fixing holes
Fig. 17 . Relief valve discharge connection
1
2
3
1. Relief valve
6. Expansion vessel
2. Relief valve discharge connection securing clip
3. Relief valve securing clip
7. Flexible connector from
4. System connection point
pump
5. Expansion vessel connection
8. O-ring
5
7
6
8
!
IMPORTANT
4