User manual
SA0061 Cattle Crush
Version: 09-07-18
Page 13 of 47
2.2. Electrical system
FUNCTION
The electrical system supplies power to the hydraulic unit, the lighting and the
electrical sockets.
See the circuit diagram for further details on the layout and operation of the
electrical installation. The circuit diagram is generally stored in the machine's
control cabinet.
The location of control equipment on your machine may differ from the
photograph below.
NOTE!
Work on the electrical installation may be carried out only by a technically
competent person.
The installation consists of the following main components
Fout!
Verwijzings
bron niet
gevonden.
a/b
Component
Description
Section/
location
1
Power cable
To connect the machine to the appropriate power
supply.
See 1
2
Operating switches
Used to switch on/off various functions.
See 5.3
3
Sockets
Tools can be connected to these.
4
Control cabinet
This contains the control components.
5
Battery box
The battery is located in this box.
6
Work lamps
These allow the working area to be illuminated.
7
Lighting
Used to switch the lamps on the crush on and off
8
230V/380V motor
Used to power the hydraulic system
9
24V motor
This drives the 24V system.
10
Vehicle lighting plug
This is used to connect the crush to the towing
vehicle's lighting system, using a cable.
11
Mover plug
The mover's remote control is connected to this.
12
Photocell (optional)
This is used to activate the holding system **
** NOTE: When the photocell is in use the animal must walk independently into the crush. If a person
walks past the optical sensor at the front they may be trapped.
Summary of Contents for SA0061
Page 1: ...User manual SA0061 Cattle Crush Version 09 07 18 User manual SA0061 Cattle Crush ...
Page 27: ...User manual SA0061 Cattle Crush Version 09 07 18 Page 27 of 47 5 4 Hydraulic control levers ...
Page 36: ...User manual SA0061 Cattle Crush Version 09 07 18 Page 36 of 47 6 2 VIEW FROM BELOW 1 ...