25 | UM-BS-EN-A3
6.2.1
Completion of Installation
Prior to starting operation, installation is to be completed with a trial run. During the trial run, all device
functions are to be carried out and checked.
ATTENTION
Check Device
After the trial run has been carried out, all bolted connections,
couplings, and other connections are to be checked for tightness.
6.2.2
Checklist for Before Starting Operation
•
Check sturdiness of the device
•
Ensure that safety equipment is intact and functional
•
Check emergency stop switch and all control functions
•
Perform a malfunction-free trial run
•
Ensure all operators have received complete and proper instruction
6.3
Replacing Parts
For detailed descriptions of and instructions on replacing BOOST parts, please contact the Woodway
Service Department (See 1.5.1 Page 9).
NOTE
The use of NON-original replacement parts may change the
characteristics of the device and interfere with the safe use.
WOODWAY does not accept liability for damages resulting from
this.
DANGER
Danger of Death by Electric Shock!
Fatal electrical shock may occur if the unit is not disconnected from
the power supply before assembly or disassembly.
►
The device must be stopped, switched off, and unplugged
before being worked on.
►
Ensure the device cannot be switched back on.
►
After the power is disconnected wait 10 minutes to ensure that
live electrical components (e.g. capacitors) have discharged.