GECO
Stoichiometric Manual
03554
64
Woodward
An automatic shut-off for engine shutdown is
required upstream of the pressure source; when the
control loses the engine speed signal, the trim
valve(s) will close automatically as a backup.
The injection point should be chosen to provide
as much mixing as possible before the intake splits
to individual cylinders; just upstream from the
existing carburetor is ideal, but downstream may be
acceptable if long intake plumbing and/or elbows are
present before the throttle.
Injection points where oil or fuel liquids pool up
should be avoided, especially if liquids drain to the metering valve.
All threads and tube fittings must be inspected for leaks with bubble-
indicating liquids or electronic flammable-gas detection equipment.
High-temperature anti-seize thread lubricant must be used to
facilitate exhaust oxygen and temperature sensor replacement.
Temperatures at the sensor threads can be as high as 1200°F (650
°C), so the anti-seize compound should be designed for this heat
range. These products typically use copper or nickel compounds,
although copper is recommended (nickel vapor is a suspected
carcinogen).
EGO Installation
Location of upstream EGO sensor(s) should be:
In the combined exhaust stream from all the controlled cylinders or after the
turbocharger.
Within 600 mm (24 inches) of the
exhaust manifold outlet or turbo outlet.
Shielded from the exhaust pulses of
another bank or turbo (where 2 exhaust
streams join) to avoid “cross-talk”
feedback from the wrong bank.
On the top 160° of the exhaust pipe
(to avoid corrosion and thermal shock
from condensation).
Drill and spot face 15.5 mm hole in suitable location.
Tap for 18 mm x 1.5 if pipe is at least 6 mm (1/4 inch) thick, or weld internally
threaded port around the hole.
Install sensor with anti-seize thread lubricant and torque to 40 N·m (30 lb-ft).
Summary of Contents for GECO
Page 8: ...GECO Stoichiometric Manual 03554 vi Woodward...
Page 65: ...Manual 03554 GECO Stoichiometric Woodward 57...
Page 66: ...GECO Stoichiometric Manual 03554 58 Woodward Figure 8 2 Wiring for Single Bank...
Page 67: ...Manual 03554 GECO Stoichiometric Woodward 59...
Page 68: ...GECO Stoichiometric Manual 03554 60 Woodward Figure 8 3 Wiring for Dual Bank...
Page 69: ...Manual 03554 GECO Stoichiometric Woodward 61 Figure 8 4 Legend Plate...