
11
of the manufacturer.
7. Installation
7.1 Take off the red cap from the optical fiber, and then insert the metal
part into the front of main unit (make sure to screw the fiber to the end).
7.2 Fix the light hood on the bottom of the optical fiber.
7.3 Battery replacement method: open the battery cover of the main unit,
take the battery out, and disconnect the plug slightly. Connect the plug of
the new battery correctly (Figure 2), put the new battery in, and then fix
the battery cover.
7.4 Charge method: For Charging, please pull out the charge port
protector of the main unit slightly, plug the output port of the adapter
into the charge port of the main unit, and then connect the adapter to the
power supply. When charging is finished, pull out the adapter and plug
the protector back into the charge port of the main unit.
Notice: Don't fix the adapter at where the operation can’t be taken
place easily.
8. Operation
8.1 Press the mode button to set the working mode, the corresponding
Summary of Contents for LED.D
Page 1: ...LED D Curing light Instruction Manual ...
Page 21: ...19 ...
Page 22: ...20 ...
Page 23: ...21 ...
Page 24: ...ZMN SM 060 V4 2 2020628 ...