12. Assemble Flag
• Cut out Paper Flag with scissors.
• Apply white glue onto backside of
Flag, fold in half and form around
Flagpole
30
and smooth surface
(Fig. 12a).
• Hold each end of Flag and push toward center creating a wavy-look and let dry (Fig. 12b).
• Install Flag Assembly on front of Building (Fig. 12c).
Tips and Techniques
Second Floor (OPTION)
Molded-in ledges on interior of Front and Back Walls are designed to add a second floor.
Cut a piece of styrene approx. 2-28/32" x 3-13/16". Test fit and cut out a notch to clear the
lighting raceway. Paint interior and styrene a flat earth-tone shade.
Painting Tips
Colors are your choice, but we recommend natural brick colors such as rust, tan or other
earth tones.
Airbrush or Hand-brush Use enamel (solvent-based) or acrylic (water-soluble) flat finish paint.
Aerosol Use flat finish spray paint.
Weathering Techniques
Mortar Wash Create the look of brick mortar or add a weathered look (formula follows).
Lay building flat so wash spreads evenly. Using a paintbrush, dab on small amounts
of Mortar Wash until desired look is achieved. Sponge off excess. Formula: Mix 1-part
acrylic paint (color suggestion: concrete or aged concrete), 12-parts rubbing alcohol,
8-parts water and 1 drop liquid dish soap.
11. Install Details cont.
6
Fig. 8a
Fig. 8a
13. Blackout Paper
Cut two strips of Blackout Paper, each
measuring 4-11/16" L x 1-3/4" W.
• Cut another two strips, each
measuring 1" L x 5/8" W.
• Place the two strips on top of each
other and cut a notch halfway up.
Position large strips horizontally
(Fig. 13a) and the small strips
vertically (Fig. 13a).
• Assemble as shown (Fig. 13a).
• Insert small assembly into the
Tower and then large into building
(Fig. 13b and Fig. 13c).
• Hold in place with a drop of glue, if
necessary.
5
1
2
Fig. 13b
Fig. 13c
Fig. 13a
Left Side (Fig. 11b)
Bench
28
, Boots
29
Front (Fig. 11c)
Front Door Light
23
23
Fig. 12a
Fig. 12b
2
5
6
8
Fig. 12c
30
29
28