8. Assemble Walls and Roof
• Snap Wall
2
and Wall
4
into place on Front Wall
1
(Fig. 8a).
• With cutout in Roof
5
facing forward, slide it into place following the grooves on Walls
2
and
4
and securing in groove on Front Wall
1
(Fig. 8b).
• Apply glue along seams from underneath building.
• Snap Back Wall
3
into place. Secure with glue along inside seams.
9. Install Chimney Backs
Chimneys have specific placement.
Arrange as illustrated.
• Insert pegs on Chimney Back
14
into
posts on left front molded-in chimney
Apply a tiny amount of glue onto pegs
before installing.
• Continue by installing Chimney Back
15
onto left rear chimney, Chimney Back
16
onto right front chimney and Chimney
Back
17
onto right rear chimney (Fig. 9a).
10. Complete Tower Assembly
• Glue Upper Tower parts
18
and
19
together (Fig. 10a).
• Glue Assembly to Base
20
(Fig. 10a).
• Glue Cap
21
and Finial
22
in place
(Fig. 10b).
• Glue Assembly to Tower.
11. Install Details
Test fit Details before gluing. When possible, insert
placement post into hole and apply adhesive on
interior of building or use a toothpick to apply a tiny
amount of glue onto post and then insert into hole.
Fig. 8b
Fig. 8a
Fig. 9a
Fig. 10a
Fig. 10b
Fig. 8a
5
Back (Fig. 11a)
Downspouts x2
24
, Light
23
, Ladder
25
, Trashcan
26
,
Electric Meter and Junction Box
27
24
18
16
17
15
14
5
4
1
2
19
20
21
22
24
27
26
25
23