![Woodland Mills HM130MAX Operator'S Manual Download Page 35](http://html1.mh-extra.com/html/woodland-mills/hm130max/hm130max_operators-manual_995004035.webp)
HM130MAX Operator’s Manual
Assemble the hour meter to the right-side of the dashboard through the two (2) small holes.
Use two (2) M4 X 30 mm pan head screws, four (4) flat washers (2 per screw), and two (2) lock
nuts. Once the entire sawmill has been assembled, snip the wire loop at the top of the meter
with either a razor or sharp knife. This will activate the meter to start measuring the vibration of
the machine, recording the hours of use on the engine.
HM130MAX-MY2020: Rev B
Page
of
33
92
04-Dec-2019
Cut wire loop on hour
meter after sawmill is
assembled
Pulley Detail
Hour meter
mounting holes
20.5 mm Spacer
M12 X 130 mm Bolt
Summary of Contents for HM130MAX
Page 2: ...This page intentionally left blank...
Page 93: ...HM130MAX Operator s Manual NOTES HM130MAX MY2020 Rev B Page of 91 92 04 Dec 2019...
Page 94: ...HM130MAX Operator s Manual HM130MAX MY2020 Rev B Page of 92 92 04 Dec 2019...
Page 95: ...This page intentionally left blank...
Page 96: ......