�
�
�
�
�
�
�
�
�
�
�
�
�
Corner Location
7
C
A
D
E
F
G
DIMENSION
FIREPLACE FRAMING
Firebox framing can be built before or after the appliance is set in place. Construct firebox framing following
Figure 2
and the
chart below for your specific installation requirements.
See Figure 3 on Page 8
for firebox dimensions. The framing headers may
rest on the top of the firebox standoffs.
The firebox may be installed directly on a combustible floor or raised on a platform of an appropriate height. When the firebox
is installed directly on carpeting, tile, or other combustible material, other than wood flooring, the firebox shall be installed on a
metal or wood panel extending the full width and depth of the enclosure.
Stud Location
Inside Chase Installation
Recessed Installation
Figure 2 - Framing Dimensions
Do not fill spaces around firebox with insulation
or other materials. This could cause a fire.
WARNING
H
�
B
C
72.50"
50.75"
20.75"
24"
$OFRYH,QVWDOODWLRQ
7.5"
35.50"
31.75"
0.50"
52.75"
14.75"
Summary of Contents for DV2500-E
Page 46: ...127 6...
Page 47: ...127 6...