
Installation
2
Installation
2.3
Installation and Setup (revision A.00 through F1.01)
1.
Position the SLR on the mill bed with the mounting brackets around the front and rear bed rails.
The shift lever should be at the front end of the mill. Make sure the SLR frame is lying flat on the
bed rails. DO NOT tighten the clamp bolts on the bed rails. The clamp bolts should only be tight-
ened before towing the sawmill with the SLR attached.
2.
Slide the SLR frame all the way over toward the inboard side of the sawmill bed until the SLR
stops touch the bed rail stop blocks.
FIG. 2-5
SLR stop
against
bed rail stop
Mounting brackets
positioned on bed rails
Shift lever
toward front
of sawmill
SM0091B