
LT15 Installation
LT15 Rev. E4.00 - E6.03
3
3-3
WM doc 9/10/20
LT15 Installation
3.2
LT15 Rev. E4.00 - E6.03
(Bed Sections Rev. E.00 - F.00): Kit SLRKIT-LT15 is required to mount the SLR.
1.
Place the rail adaptor on the last bed rail of the second bed section as shown.
2.
Adjust the stop bolt against the frame tube.
3.
Install the stop block to the last bed rail of the first bed section and tighten the clamp bolt.
4.
Position the SLR on the bed with the shift handle toward the front of the sawmill.
5.
Push the SLR stops against the rail adapter and stop block.
FIG. 3-3
Shingle/Lap Siding
(SLR) Option
Rail Adaptor
(See Detail #2)
Stop Block
(See Detail #1)
150128-1
DETAIL #1
DETAIL #2
SLR Stop against
Stop Block
Clamp Bolt
Stop Bolt
against frame
tube
Shift lever
toward front
of sawmill