
Operation
Lap siding setup
5
Operation
WM doc 9/10/20
5-2
for sawing shingles.
Loosen the cam set screws and slide the cam along the shaft.
Reset the cams according to
.
5.
Position the cant so it is centered in the SLR frame.
6.
Tighten the front clamp to secure one end of the cant.
7.
Slide the outer clamp half in until it contacts the block.
8.
Turn the clamp handle clockwise to firmly clamp the block in position.
9.
Be sure the block is securely clamped so the block will not come loose while being cut.
FIG. 5-2
Adjust clamps
inside of cams
Siding taper
adjustment
bolts up
When sawing siding, the
lift roller should tilt SLR frame
when shift lever is thrown
SM0091-6
Shingle taper
adjustment bolt
to 1/4"
Setup for Siding