Installation Procedure
Wiring Installation for Standard Sawmills
1
1-28
AS00doc032519
Installation Procedure
See Figure 1-25.
There are two red 12VDC wires provided. Only one of these wires will
be used, depending upon your mill model. Both wires have a 1/4” ring terminal connected
to one end. For standard model sawmills, use the wire with the #10 fork terminal on the
other end of the wire.
5.
Loosen the screw on terminal 2 of the up/down drum switch. Leaving any pre-existing
connections in place, install the #10 fork to TRM 2 of the up/down drum switch. Retighten
the screw to secure in place.
See Figure 1-26.
FIG. 1-25
FIG. 1-26
3H0568-1
5/16" Ring
(Super Models)
#10 Fork
(Standard Models)
Terminal 2