Installation Procedure
Wiring Preparation
Installation Procedure
AS00doc032519
1-17
1
1.4
Wiring Preparation
1.
If your sawmill is equipped with a previous version Accuset option, skip to Final Installa-
tion (
).
IMPORTANT!
Make sure the mill is properly set up before
performing Accuset installation and/or operation.
WARNING!
Failure to put front outrigger down before mov-
ing cutting head from the rest position (rear of the mill) may
result in serious injury.
2.
Return the saw carriage to the front of the mill.
3.
Raise the cutting head to the 22 inch mark on the blade height scale.
4.
Turn the sawmill control box key to the OFF (#0) position and remove the key.
5.
Unbolt and remove the top cover from the battery box and set aside. Remove the nega-
tive battery terminal from the battery post to disconnect power from the mill. Wrap a cloth
or temporary insulating material around the terminal to ensure it does not contact the post
during Accuset installation.
WARNING!
Before performing any service to the sawmill
control box panel, turn the key to the OFF position, discon-
nect the negative battery lead, and remove all rings,
watches, etc.... Failure to do so may cause serious injury
and machine damage.