
35
3065014_201612
Electrical terminal assignment
It is recommended that you have the system serviced annually by a qualified contractor.
Recommended cylinder temperature:
The cylinder temperature should be approx. 5-10 K above the required DHW temperature.
Notes
Commissioning
VBus
VBus
PWM
A
12
V
Out
S3
GND
DIP
S4
Sensors
S2
S1
100 ... 240 V
T2A
50-60 Hz
N
N
N
N
N
R3
R3 R2 R1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
R2
R1
L
L
R1-R3|1 (1) A 240 V~
R4|1 (1) A 30V
R4
TX
PWM
B
R4 RX
1
4
3
2
FreshControl
2
12 V
Out
T-WW/dV
VFS
S4
S1
R1
R2
PWMA
PWMB
T-VL
2
2
3
3
3
Netz
Mains
4
V
IP 20
40
45
50 55
60
65
°C
SERVICE
>70° C
WARNING!
Electric shock!
When the casing is open, live
components are exposed.
Summary of Contents for FWS-2-80
Page 5: ...5 3065014_201612 Joogiveekeskus Ühenduskomplekt Paigalduskomplekt Tarnepakend ...
Page 15: ...15 3065014_201612 Primaarpumba PWM signaal 3 Hooldus ...
Page 16: ...16 3065014_201612 Segisti mootori vahetamine Hooldus ...
Page 19: ...19 3065014_201612 Hooldus ...
Page 31: ...31 3065014_201612 Freshwater module Connection set Installation set Standard delivery ...
Page 41: ...41 3065014_201612 PWM signal primary pump 3 Maintenance ...
Page 42: ...42 3065014_201612 Replacing the mixer motor Maintenance ...
Page 45: ...45 3065014_201612 Maintenance ...
Page 67: ...67 3065014_201612 Pirminio siurblio PWM signalas 3 Techninė priežiūra ...
Page 68: ...68 3065014_201612 Maišymo variklio keitimas Techninė priežiūra ...
Page 71: ...71 3065014_201612 Techninė priežiūra ...
Page 93: ...93 3065014_201612 PWM signāls primārajam sūknim 3 Tehniskā apkope ...
Page 94: ...94 3065014_201612 Jaucēja motora nomaiņa Tehniskā apkope ...